The proposed system should include:
• 10 x Axis Q9216-SLV cameras or equivalent approved anti-ligature cameras
• 10 x 64GB surveillance-grade Micro SD cards
• All associated cabling and containment as required
• Testing and commissioning of the complete installation
Cameras:
• 4-megapixel, impact-resistant, anti-ligature cameras
• Equipped with invisible IR illumination to provide high-quality footage in low-light conditions
• Installed to provide coverage of identified higher-risk areas in accordance with supplied drawings and specifications
Installation:
• New cameras are to be cabled back to the nearest communications cabinet and integrated with the existing recording infrastructure.
• The quotation should clearly state any assumptions regarding the availability of spare capacity on the existing recording equipment and identify any additional requirements if such capacity is unavailable.
Please note:
• Existing cameras located in the Office, Staff Room, New 136 Observation Room, and Clinic will be removed by others prior to installation.
• Please identify any exclusions, assumptions, or additional works that may be required.
• Labour should be based on normal working hours unless otherwise specified.
NHS Wales Shared Services Partnership (NWSSP) All-Wales Laundry Service (AWLS), is seeking to appoint a suitably qualified and experienced contractor to undertake the replacement of the Programmable Logic Controller (PLC) and associated software controlling the Continuous Batch Washer (CBW) at Llansamlet Laundry Production Unit, Swansea. The facility processes approximately 35,000 linen items per day, with the CBW playing a critical role in maintaining operational capacity and service continuity.
The successful contractor will be required to undertake a full survey and mapping of existing panel I/O and wiring configurations, supply and install a replacement PLC, provide compatible software interfaces, and ensure continued operation of the existing machine and control programmes. The project must also include full integration with associated press PLCs and sorting systems, commissioning of the completed installation, and comprehensive training for on-site personnel.
All works must be completed outside normal production hours to ensure no disruption to laundry operations. The Authority requires the complete delivery, installation, commissioning, training, and acceptance of the works by 28 February 2027, with all associated invoicing completed by 31 March 2027. Contractors must demonstrate relevant technical capability and experience in industrial automation, PLC systems, and operationally critical production environments.
NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)WAC-658769
Who pays? Understanding cost misalignment between the NHS and Local Government
The Local Government Association (LGA) is seeking a supplier to undertake a focused policy research project exploring the interaction between NHS Continuing Healthcare (CHC) and local authority adult social care.
Recent evidence has highlighted growing concerns about the relationship between CHC decision-making, adult social care expenditure and the incentives created by current funding arrangements. ADASS's Spring Survey 2026 found that 75% of Directors of Adult Social Services reported an increase in the number of people presenting to adult social care who were, or previously would have been, eligible for CHC, while 84% reported that Integrated Care Board (ICB) disinvestment in CHC was contributing to adult social care overspending pressures.
Research published by The King's Fund found that CHC eligibility rates have fallen significantly despite no change to the national eligibility framework, alongside substantial variation between different ICB areas.
While CHC provides the primary lens for this project, the LGA is also interested in the wider question of whether current funding and accountability arrangements across health and social care create incentives that transfer costs and risks between organisations rather than supporting whole-system decision making.
The LGA wishes to better understand:
• How these issues are playing out locally
• Whether current arrangements create misaligned incentives between organisations
• The impact on local government, the NHS, people drawing on care and support, and unpaid carers
• What reforms could improve alignment between health and social care funding and accountability.
This work will inform future LGA policy development and engagement with government, national partners and stakeholders.
Well-Led Review of Avon and Wiltshire Mental Health Partnership NHS Trust
Avon and Wiltshire Mental Health Partnership NHS Trust (AWP) provides mental health services across Bath and North East Somerset, Bristol, North Somerset, South Gloucestershire, Swindon and Wiltshire, from more than 90 community and inpatient sites and through partnerships with external organisations. Services include acute mental health, recovery, liaison and dementia services, forensic services, Child and Adolescent Mental Health Services and a range of highly specialist mental health services.
AWP is currently in segment 3 of the NHS Oversight Framework and rated Amber-Green under the Provider Capability assessment. Following a Care Quality Commission inspection in 2024, reported in May 2025, the Trust’s well-led rating was ‘requires improvement’. AWP operates across two financially challenged Integrated Care Systems and works with the South West Provider Collaborative for mental health services.
The Board has invested in strengthening external stakeholder relationships and reviewing partnership working models. It has also experienced material membership changes since the previous well-led inspection, including a new Chair in autumn 2024 and three new Non-Executive Directors commencing in 2026.
AWP now requires an independent, developmental review of leadership and governance against the Care Quality Commission well-led framework. The review will provide objective and constructive challenge, identify prioritised developmental actions and inform targeted improvement work to secure and sustain future performance.
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA18544.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA18544 as the reason for registration.
Avon and Wiltshire Mental Health Partnership NHS trustWAC-663242
CA18544 - Well-Led Review of Avon and Wiltshire Mental Health Partnership NHS Trust
Avon and Wiltshire Mental Health Partnership NHS Trust (AWP) provides mental health services across Bath and North East Somerset, Bristol, North Somerset, South Gloucestershire, Swindon and Wiltshire, from more than 90 community and inpatient sites and through partnerships with external organisations. Services include acute mental health, recovery, liaison and dementia services, forensic services, Child and Adolescent Mental Health Services and a range of highly specialist mental health services.
AWP is currently in segment 3 of the NHS Oversight Framework and rated Amber-Green under the Provider Capability assessment. Following a Care Quality Commission inspection in 2024, reported in May 2025, the Trust's well-led rating was 'requires improvement'. AWP operates across two financially challenged Integrated Care Systems and works with the South West Provider Collaborative for mental health services.
The Board has invested in strengthening external stakeholder relationships and reviewing partnership working models. It has also experienced material membership changes since the previous well-led inspection, including a new Chair in autumn 2024 and three new Non-Executive Directors commencing in 2026.
AWP now requires an independent, developmental review of leadership and governance against the Care Quality Commission well-led framework. The review will provide objective and constructive challenge, identify prioritised developmental actions and inform targeted improvement work to secure and sustain future performance.
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA18544.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA18544 as the reason for registration.
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA18544.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA18544 as the reason for registration.
Any queries please contact MultiQuote on 020 3920 8054.
Avon and Wiltshire Mental Health Partnership NHS trustWAC-663573
View 3-notice timelineLatest notice released 31 Dec 2026
NHS & HealthcareTender
Adult and Children & Young People (CYP) ADHD and Autism Service(s)
NHS Birmingham and Solihull Integrated Care Board and NHS Black Country Integrated Care Board are seeking qualified and experienced providers for the provision of delivering Adult and Children & Young People (CYP) Attention Deficit Hyperactivity Disorder (ADHD) and Autism Service(s). The services are to be delivered across Birmingham, Solihull and the Black Country. <br/><br/>Arden & Greater East Midlands Commissioning Support Unit (AGCSU) is conducting a Direct Award Process B (DAP B) exercise as an agent for and on behalf of the Commissioner(s). The DAP B exercise will be carried out in accordance with the requirements of the Health Care Services (Provider Selection Regime) Regulations 2023 (PSR). <br/><br/>As a result of this Process, the ICB(s) intend to award zero volume, zero value contract(s) to all successful providers. While there is no guarantee of activity, we will be issuing Indicative Activity Plan (IAPs).<br/><br/>Successful provider(s) will be awarded with a contract for a period of 12 months with the Commissioner having the option to extend the Contract for up to a further 12 months + 12 months.
NHS Birmingham and Solihull Integrated Care BoardWest MidlandsWAC-584272
The project reference is C395670 and the closing date for submission of the completed Expression of Interest is 11:59pm, on Sunday 31 December 2028.
Expression of interest request for Project Innovation Partners
Midlands Life Science Hub
Partnership in Action. Innovation with Impact
University Hospitals of Leicester NHS TrustEast MidlandsWAC-532336
Pulsed Field Ablation (PFA) for Atrial Fibrillation
Preliminary market consultation to inform the NHS commercial strategy for Pulsed Field Ablation (PFA) for Atrial Fibrillation. Please note all stated financial values in relation to this notice are nominal, as the financial envelope is yet to be defined. Projected contracting dates in the notice, similarly do not reflect any plans as these are yet to be defined. To express interest, review and respond to the request for information questionnaire please register and apply via Atamis e-sourcing portal using the following link. https://atamis-1928.my.site.com/s/Welcome select live opportunities, navigate to the project titled: "Pulsed Field Ablation (PFA) for Atrial Fibrillation" (ref: C477380) and follow the instructions to download, complete and upload your response to the questionnaire.
The Royal Berkshire NHS Foundation Trust is seeking expressions of interest from organisations who are capable of and are interested in maintaining the Trust's Topcon ophthalmology assets. The assets are:
- Six (6) DRI OCT Triton Plus Retinal OCTs;
- One (1) 3D OCT-2000 3D Scanner;
- One (1) LM-8C Lensmeter; and
- One (1) KR 8900 Automated Ophthalmic Refractometer
The Trust is seeking a supplier for a multi-year contract preferably on fully comprehensive cover together with IT/Integration support and the use of OEM parts.
Interested organisations should email [email protected] to register their interest in this opportunity.
Maintenance of Quantel Medical Easyret 577nm Fiber Lasers
The Royal Berkshire NHS Foundation Trust is seeking expressions of interest from organisations who are capable of and are interested in maintaining the Trust's two (2) Quantel Medical Easyret 577nm Fibre Lasers.
The Trust is seeking a supplier for a multi-year contract preferably on fully comprehensive cover together with IT/Integration support and the use of OEM parts.
Interested organisations should email [email protected] to register their interest in this opportunity.
District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
Mid and South Essex NHS Foundation Trust is undertaking pre-market engagement in advance of a planned procurement for the provision of Performance, Operational Monitoring and Planned Preventative Maintenance Services for the Trust's District Heating Networks and LTHW dual fuel boilers for the Basildon and Broomfield Hospital sites; with the potential for additional services at the Southend site.
The Trust has recently invested in significant decarbonisation infrastructure across its hospital estate, including district heating networks, energy centres, plate heat exchanger installations, thermal stores, pumps, boilers and specialist control systems. The Trust is seeking to engage with suitably qualified maintenance providers to better understand market capability, innovation opportunities and contract delivery models prior to commencing a formal procurement process.
Indicative Scope
The successful contractor may be responsible for:
• Planned preventative maintenance (PPM)
• Operational monitoring and performance management
• Remote monitoring and alarm management
• 24/7 reactive maintenance and emergency call-outs
• BMS and controls maintenance
• Water treatment monitoring and management
• Boiler and heating plant maintenance
• Pressurisation systems
• Pumps and distribution networks
• Plate heat exchangers
• Thermal stores
• Heat metering systems
• Fuel oil infrastructure
• Lifecycle planning and asset management
• Energy performance optimisation and reporting
• Coordination with specialist subcontractors and CHP maintenance providers where required.
Estate
The contract is expected to cover:
Basildon Hospital
• District Heating Energy Centre
• Multiple remote plantrooms
• CHP-supported district heating system
• Multiple heating and domestic hot water PHE installations.
Broomfield Hospital
• District Heating Energy Centre
• Multiple remote plantrooms
• CHP-supported district heating system
• Contingency remote boilers
• Heating and hot water PHE installations.
Southend Hospital
• District Heating Energy Centre
• Multiple remote plantrooms
• CHP-supported district heating system
• Integrated and remote network boilers
• Heating and hot water PHE installations.
Objectives of Engagement
The Trust wishes to understand:
• Market appetite for the opportunity.
• Appropriate contract duration.
• Options for performance-based maintenance arrangements.
• Best practice approaches to remote monitoring and asset management.
• Appropriate KPIs and performance measures.
• Digital maintenance management solutions.
• Innovations that could improve system efficiency and operational resilience.
• Approaches to lifecycle planning and asset replacement forecasting.
• Mobilisation requirements and anticipated timescales.
Supplier Requirements
Interested suppliers should ideally demonstrate experience in:
• Large district heating networks.
• Acute healthcare environments.
• CHP and energy centre infrastructure.
• Building management systems.
• Water treatment and closed heating systems.
• PPM and reactive maintenance services.
• Energy performance optimisation.
Next Steps
Suppliers interested in participating in the engagement exercise are invited to register their interest. Further details regarding engagement sessions, site visits and questionnaires will be circulated in due course.
Please note this engagement exercise is for information gathering purposes only and does not constitute a call for competition.
Mid and South Essex NHS Foundation TrustWAC-660106
Maternity and Neonatal Patient Reported Experience Measure (MatNeo PREM)
NHS England is undertaking a market engagement exercise via a request for information exercise to understand the capability and capacity of suppliers and feedback on the service model in respect of Maternity and Neonatal Patient Reported Measure Service.
The deadline for submission of RFI responses is 12:00 on 19 October 2026.
Please follow the link to access the RFI Documentation and submit your RFI submission (C475209). https://health-family.force.com/s/Welcome
Zero-Capex Solar PV & Battery EnergyStorage System (BESS) Energy-as-a-Service Project, Wansbeck General Hospital
The Trust aims to ensure the existing on-site energy centre is used as efficiently and effectively as possible in a manner that reduces energy costs and carbon emissions. The Trust is therefore seeking to install a battery storage and solar PV solution at Wansbeck General Hospital with the following requirements:
- A containerised, modular system fort he Battery Storage capable of relocation and expansion, if required.
- A cost model whereby the Trust makes no capital investment and pays no ongoing servicing/operational costs and the Trust is paid a fixed percentage of the savings or a flat annual fee.
- Integration with the Trust’s HV network and any future renewables.
- Measurement and verification services to demonstrate performance of the installed solution and the associated savings achieved.
Northumbria Healthcare NHS Foundation TrustWAC-659777
Supplier Engagement Event for Out of Hours General Medical Services for Powys Teaching Health Board
Powys Teaching Health Board intends to undertake a competitive procurement process in early 2027 for the delivery of Out of Hours General Medical Services and medical cover for community hospitals across Powys. The procurement will provide interested suppliers with the opportunity to bid for the provision of these services under a new contractual arrangement, with commencement target date of 1st October 2027.
The Health Board is seeking a provider capable of delivering safe, high quality, sustainable and patient-centred services that meet the needs of the Powys population and support wider urgent and unscheduled care pathways. The procurement process will offer a transparent and equitable opportunity for suitably qualified providers to participate. Further information, including the service specification, procurement timetable and tender requirements, will be issued as part of the formal procurement process, and a Supplier Engagement Event will be held via Teams on 20th October 2026.
Interested parties should contact the co-ordinator of the event [email protected]
NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)WAC-657208