Loading page content…
Loading page content…
Loading contract search results…
5 live procurements · Click a result to see its full lifecycle · Updated daily · Contracts Finder + Find a Tender Service
The Natural History Museum has launched NHM150, an ambitious transformation programme leading up to its 150th anniversary in 2031. The programme will significantly enhance the Museum’s public offer, increasing access, reach and impact through a major renewal of galleries and visitor experiences. Through NHM150, the Museum will: •Breathe new life into four existing galleries. •Open three magnificent new galleries. •Showcase the natural world’s treasures to one million more visitors a year. •Engage 10 million school children, families and changemakers through local national and global programmes. •Create over 100 million advocates for the planet. The first phase is already underway, and the second phase will focus on the west wing of the Waterhouse building, combining base-build refurbishment, including improved circulation and facilities, with the design and installation of new exhibitions and displays. This second phase will form part of a funding application to the National Lottery Heritage Fund (NLHF). As part of Phase 2 the Museum is tendering for the exhibition design for the following 4 galleries: •the Old General Herbarium, •Origins Gallery, •Dinosaur Gallery 1 •Dinosaur Gallery 2
£2,400,000
Contract value
The NHM intends to appoint a suitably qualified and experienced Lead Design Consultant to provide professional services in connection with the upgrade and replacement of the Public Address and Voice Alarm (PAVA) system across the Museum estate. The Consultant will be expected to take on Electrical Design Services and the BSA Principal Designer Role which can either be in house or sub-contracted to the Lead Designer. During the tender, confidential information will be shared requiring the completion of an NDA to participate in the tender. Should you be interested in tendering for this opportunity, please download and complete the NDA in the link below and send this back via the Message Centre for counter signature. Once the NDA has been completed by both parties, the Tenderer will be granted access to the tender documentation. We anticipate the tender will be published in late April/early May. As per the details of the Engagement below, we have contacted several suppliers regarding this tender. We would welcome any further comments regarding the scope of works. Please send a message via the Message Centre on Delta e-Sourcing. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Fire-detection-systems./VYU4S6NZ25 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/VYU4S6NZ25
£200,000
Contract value
The Old General Herbarium (OGH) Beta Project is a light touch refurbishment of a section of the OGH gallery to bring it back into public display for the first time since 1948. The project will install a temporary pop-up display opening in September 2026. The Museum is running a competition for the provision of Principal Contractor services for the refurbishment and fit-out works in the gallery. In order to access the tender documents for the OGH Beta Principal Contractor tender exercise, all tenderers must complete the NDA available in the SQ stage document library. The NDA must be signed by an appropriate representative of the tendering company and returned to the Museum for countersignature. Once the NDA has been completed by both parties, it will be sent to tenderers for record keeping. The tenderer will then be added to the Tenderbox stage, where the tender documents will be made available from the 30th April 2026. For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Construction-work-for-art-and-cultural-buildings./MQG6SMFAS7 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/MQG6SMFAS7
£140,000
Contract value
The Natural History Museum has announced important transformations of its internal spaces ahead of the 150th anniversary of the opening of the South Kensington site, occurring in 2031. As part of these transformations, the popular Dinosaur Gallery will be restored, and the Origins Gallery, the Old General Herbarium and the Swing Space, currently closed to the public, will be reopened and returned to public use. These galleries are identified collectively as the' Western Galleries'. The works in each gallery will be articulated in two phases: base build, which is the object of this tender, and fit out, which will be tendered separately. The first works to commence will be the Swing Space in Autumn 2027 (base build) for an opening in 2028, followed shortly after by the Botany Library and the Old General Herbarium, due in 2029, Dinosaur Gallery, opening in 2030, and Origins Gallery that will be completed in 2031. A Feasibility Study has just been completed both for base build and fit-out leading to the identification of a set of recommended options for the base build and a set of design principles for the fit-out. The base build works for all the galleries in scope will encompass design and works for (high-level scope, including but not limited to): - Conservation of the gallery spaces - Making good of the fabric of the building - New ventilation and heating / cooling system and associated Building Works in Connection (BWIC) - Mechanical, electrical and public health systems - Creation of new plant rooms to support the increased needs of the spaces - Required structural works Additional works (including but not limited to): - clearance of existing spaces - Dismantling and removal of Dinosaur Gallery walkway - Decant and recant of Botany Library contents - Temporary relocation of Dino Shop - Decant and relocation of offices to make room for the new circulation core - Relocation and enlargement of ground floor café - Conservation of existing fixtures and finishes (e.g. cabinets and bookcases) in Old General Herbarium and Botany Library - Removal of existing Dino shop and dog leg corridor in the Swing Space - Creation of 2 new vertical circulation cores (lifts and staircase) - Decant and relocation of offices to make room for the new circulation core - Creation of new toilets and ancillary spaces - Relocation and enlargement of ground floor café - Creation of new café on the first floor - Fit out of new Dino Shop and the two cafes. The appointed consultants will be asked to act as Lead Architect, developing the base build design for the galleries and ancillary spaces across RIBA stages 2-7, supervising and coordinating the works of the other base build consultants, such as, but not limited to, MEP consultants, circulation consultants, accessibility consultant and fire consultant and coordinating the fit-out consultants to ensure continuity between the projects. They will also be asked to provide Heritage consultancy, structural engineer, sustainability and BSA Principal Design services for the base build and fit out projects. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Construction-work-for-art-and-cultural-buildings./64839M3UD2 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/64839M3UD2
£2,000,000
Contract value
NHM is seeking to identify and appoint a supplier to provide a Retail Merchandise Management solution, including implementation, configuration and ongoing support, plus software licenses and associated hardware For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Computer-equipment-and-supplies./6JX2HCUF93 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/6JX2HCUF93
£530,000
Contract value