Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Natural History Museum |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | £950,000 |
| Estimated Value (inc. VAT): | £1,140,000 |
| Release Date: | 10 September 2026 |
| Application Deadline: | — |
| Contract Start Date: | 2 November 2026 (Estimated) |
| Contract End Date: | 29 July 2027 (Estimated) |
| Contract Duration: | 9 months |
| Procurement ID (OCID): | ocds-h6vhtk-06f657 |
| Notice Reference: | 085686-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
The Museum is undertaking a procurement process to appoint a suitably qualified and experienced Principal Contractor with specialist façade expertise on a Design and Build basis for the design, engineering, procurement, manufacture, installation and completion of the works associated with the upgrade and replacement of the DC1 Glass Solar Wall within the Museum estate. The Contractor shall provide all resources, specialist façade design input, management, supervision and coordination necessary to deliver the works in accordance with the Contract, detailed performance specification and Employer’s Requirements. The Darwin Centre Phase 1 (DC1) is a prominent building in the Museum complex visible from Queens Gate in South Kensington and overlooking the newly created and award winning UNP gardens. The replacement of this façade will enable this section of the site to be returned to operational functionality and integrated back into full use. An investigative study was commissioned by the Museum following the failure of three glass panels on the South Facing ‘Solar Wall’ elevation of the DC1. The solar wall was installed in 2002, and the secondary components within façade systems such as these usually have an expected service life of 25 years if correctly maintained.
Published contracts in the last 12 months
78
total contracts
£51.7m
total value
£1,148,619
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£950,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →