is a more substantial intervention involving the adaptation of the existing gallery to create a new flexible exhibition and learning environment.
The design language is inspired by the aesthetic of a contemporary encouraging experiment and discovery. Using science lab a flexible and sustainable material
palette, selected to enable reuse, adaptation life of the gallery. and reconfiguration throughout
The works include the construction of new walls and exhibition structures, the formation of additional storage areas, the installation of an AV control booth, and
the creation of new display and interpretation spaces. Associated flooring, finishes, services integration and exhibition quality wall surfaces are also included as part of the overall fit
out.
For more information about this opportunity, please visit the eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Museum-exhibition-services./582ZUUGTDB
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/582ZUUGTDB
ROG First Light Exhibitions Audio Visual Hardware Contractor
This procurement exercise is to secure an Audio Visual Hardware Contractor to deliver exhibitions audio visual hardware across a suite of new Royal Observatory Greenwich exhibitions, as part of the ROG First Light Project.
The Audio Visual Hardware Contractor will be responsible for delivering and installing the audio visual equipment and systems, as well as the development and installation of the Contractor's Design Portion, for exhibitions AV across both the north and south parts of the ROG site. Their responsibilities will include:
- the supply and installation of audio visual hardware relating to the exhibitions
- providing drawings which will be coordinated by the OPOE and OPITU Setworks Principal Contractors
- coordinating with the OPOE and OPITU Setworks Principal Contractors at all times, during both offsite and onsite periods
- coordinating with a number of other client-direct works packages, including Digital Media
The Audio Visual Hardware Contractor will also be responsible for certain Contractor Design Portions.
This will be a two-stage procurement process including a PSQ process from which contractors will be shortlisted. Shortlisted contractors will be invited to Tender. Contractors will be invited to visit site. Full details of the procurement procedure can be found in the procurement documentation.
For more information about this opportunity, please visit the eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Museum-exhibition-services./8S88U624C2
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/8S88U624C2
This procurement exercise is to secure an Orrery Contractor to deliver orreries at various points of the Royal Observatory Greenwich site, as part of the ROG First Light Project.
The Orrery Contractor will be responsible for the development, engineering, fabrication, installation and commissioning of two orreries (mechanical models of the solar system) across the ROG, both kinetic and interactive. The Contractor's responsibilities will include elements of Contractor Design as well as coordination with exhibition designers and other contractors, both off-site and on-site.
This will be a two-stage procurement process including a PSQ process from which contractors will be shortlisted. Shortlisted contractors will be invited to Tender. Contractors will be invited to visit site. Full details of the procurement procedure can be found in the procurement documentation.
For more information about this opportunity, please visit the eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Museum-exhibition-services./FA79DWW9GC
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/FA79DWW9GC