| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | National Highways |
| Main Category: | Works |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
5 June 2025
Closed
Estimated Value
£792,230.58
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £792,230.58 |
| Release Date: | 20 October 2025 |
| Application Deadline: | 5 June 2025 |
| Contract Start Date: | 5 June 2025 |
| Contract End Date: | 19 August 2025 |
| Contract Duration: | 2 months |
| Procurement ID (OCID): | ocds-b5fd17-d282dff4-f358-4079-a27f-dc681fde124c |
| Notice Reference: | dc4f333a-23a5-4d30-b101-4739429ac1eb-868753 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £764,715.6 |
| Award decision date: | 29 April 2025 |
| Award status: | Active |
1. Principal Contractor and welfare provision (Octavius Infrastructure Limited) 2. Clearance of nearside and offside overburden and minimal vegetation clearance where required only (Octavius Infrastructure Limited). 3. Resurfacing as per design and specification, including various inlay depths and 0.5m inlay into hardshoulder where it drains to nearside and to edge of carriageway where drains to offside for road safety audit purposes (Breedon Colas JV) 4. Installation of road markings and studs. Works to include replacing surface mounted studs with milled in studs from a previous scheme as indicated on drawings (Premier Roadmarkings Limited). 5. Provision of traffic management including equipment for protection of overhead structures and powerlines, pedestrian management and diversion signage (H W Martin). 6. Installation of detector loops and commissioning (Mason Street Furniture) 7. Pegging and marking for sign works (Mason Street Furniture) 8. Remove redundant post in front of sign, remove existing sign and posts and install 1nr traffic sign as per design. Traffic sign to be installed outside the working width of existing barrier. Traffic sign on offside to be removed is illuminated. Octavius to liaise with NH for handover to disconnect (Octavius Infrastructure Limited) 9. Bridge joints to be replaced as following (VolkerLaser): - Little Stanney Bridge - 2nr full depth APJ replacement. The asbestos survey shows north joint depth of 95mm and south joint depth of 105mm. PC to inspect the joints when planed off surface course and see if can confirm that they are definitely APJs. If no APJ is evident seek advice and determine way forward. - Shropshire Union Canal - 2nr top off APJ only - Stoak A (M56 MP 56/1) - no works required at mechanical joint but check condition on site of nosing material following resurfacing works. 1nr full depth APJ replacement as joint is leaking when viewed from underneath structure. When replacing this joint make sure it is installed in correct alignment and not skewed like the current crack seal. 10. All gullies, side entry kerbs, drainage channels etc within scheme extents need to be checked and cleared upon completion of the works to ensure that there are no obstructions/blockages (Octavius and Breedon Colas)
Published contracts in the last 12 months
300
total contracts
£22947.0m
total value
£101,088,033
average contract size
Typical categories
ETM Incursion Warning Radar System – Product Purchase including National Rollout
National Highways · WAC-494756
Maintenance and Response Contract (M&R) 2
National Highways · WAC-479833
National Highways Vehicle Recovery Service Contract (4th Generation)
National Highways · WAC-448384