| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | National Highways |
| Main Category: | Works |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
3 June 2025
Closed
Estimated Value
£231,185.88
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £231,185.88 |
| Release Date: | 16 October 2025 |
| Application Deadline: | 3 June 2025 |
| Contract Start Date: | 3 June 2025 |
| Contract End Date: | 1 September 2025 |
| Contract Duration: | 3 months |
| Procurement ID (OCID): | ocds-b5fd17-c8f45664-7404-4c97-9562-fd625cb7f1a7 |
| Notice Reference: | 9693df03-16b1-476f-8386-44752fbbf253-868525 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £231,185.88 |
| Award decision date: | 27 April 2025 |
| Award status: | Active |
A63 Western IC EB Entry Slip Road - 2000A63/443 (0.755km long) This is a single lane slip road which leads off the A15 SB. Records indicate this slip road was resurfaced in 2016 with some previous deeper targeted inlays completed in 2008. The current defects include surface course deterioration, joint deterioration and cracking. Some defects are present in the local authority owned section, 10m prior to the start of the slip road - the scheme has been extended to incorporate these defects. There are currently no concerns with regards to texture however, between Ch.0m and 150m SCRIM is as low as -.005. There are two isolated areas of rutting at 11.5mm and TSD Cat 3 has been recorded between Ch.0m and 150m. Deflectograph data is not currently available. Wholescale inlays of 90mm deep are proposed for the entire length of the slip road. This approach acknowledges the core findings and Cat 3 TSD readings however, there are no significant structural failures and this depth is deemed appropriate given the visual defects. The only other option would be to go much deeper (full depth reconstruction) and the low traffic figures and type of defects do not justify this. The chevron area between the slip road and mainline is to be resurfaced. The existing drainage channels are to be replaced as they are life-expired and difficult to maintain. It should be noted that slot drainage now requires a departure from standards, refer to Appendix G for alternative drainage system to be used. Additional information/survey data to be passed onto the Detail Designer as soon as it becomes available. The full extents of the slip road should be renewed - extend into lane 1 (full width) if necessary to ensure the narrow end is fully renewed. There are no structures affected by this scheme. Loops have not been identified within the scheme extent
Published contracts in the last 12 months
300
total contracts
£22947.0m
total value
£101,088,033
average contract size
Typical categories
ETM Incursion Warning Radar System – Product Purchase including National Rollout
National Highways · WAC-494756
Maintenance and Response Contract (M&R) 2
National Highways · WAC-479833
National Highways Vehicle Recovery Service Contract (4th Generation)
National Highways · WAC-448384