| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | National Highways |
| Main Category: | Works |
| Procurement Method: | Call-off from a framework agreement |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
18 May 2025
Closed
Estimated Value
£12,471.54
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £12,471.54 |
| Release Date: | 15 October 2025 |
| Application Deadline: | 18 May 2025 |
| Contract Start Date: | 18 May 2025 |
| Contract End Date: | 18 July 2025 |
| Contract Duration: | 2 months |
| Procurement ID (OCID): | ocds-b5fd17-cf4906c9-055e-4081-bc95-9e82b225327b |
| Notice Reference: | 8030b41b-224b-492a-9545-452f3c29dbe3-868351 |
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £12,471.54 |
| Award decision date: | 2 June 2025 |
| Award status: | Active |
The M20 Thurnham Lane North and Water Lane North & South structures are undergoing partial deck refurbishment, which is scheduled for September 2025. For all three bridge structures, the Preferred Option to address the stated network need and based on a Whole Life Costing of viable options, is Option 2; to replace the West expansion joint from stringcourse to stringcourse with Part 3 Flexible Plug Joint. This requires a surfacing inlay with HRA the full length of each bridge and 15m beyond each joint in order to accept the replacement joint. On all three structures, to preserve the existing East Joint, and to maintain the running surface over the joint, transition strips using flexible plug joint material are to be laid to the back of the joint rails. For each bridge, the longitudinal joint on the structure is to be raked out and replaced with polysulphide sealant. This approach ensures a consistent solution across all three bridge structures.
Published contracts in the last 12 months
300
total contracts
£22947.0m
total value
£101,088,033
average contract size
Typical categories
ETM Incursion Warning Radar System – Product Purchase including National Rollout
National Highways · WAC-494756
Maintenance and Response Contract (M&R) 2
National Highways · WAC-479833
National Highways Vehicle Recovery Service Contract (4th Generation)
National Highways · WAC-448384