Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | National Highways |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): | £14,500,000,000 |
| Estimated Value (inc. VAT): | £17,400,000,000 |
| Release Date: | 29 September 2025 |
| Application Deadline: | 14 November 2025 |
| Contract Start Date: | 14 September 2027 (Estimated) |
| Contract End Date: | 15 September 2035 (Estimated) |
| Contract Duration: | 8.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-0515f3 |
| Notice Reference: | 060400-2025 |
All 2 notices for this procurement, oldest first.
Scheme Delivery Framework 2 (SDF2)
Scheme Delivery Framework 2
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
| Call-off method: | Both: direct call-off and mini-competition |
| Maximum operators: | 212 |
| Period rationale: | The Framework Agreement will have a term of 8 years for the following reasons: - The longer framework term allows our supply chain to invest in innovation, people, and equipment, giving overall best value, maximising productivity, and the ability to meet efficiency targets. - Building collaborative relationships and understanding the different ways of working takes time (up to two years), therefore increasing the term beyond 4 years maximises that investment in time and effort within the strategic partnerships. - Reducing the number of times the Small, Medium Enterprises (SMEs) within our supply chain need to tender provides stability and longer-term business prosperity. - Results from Market Engagement showed that the supply chain preferred an 8-year framework over a 4 or 6-year framework for the reasons mentioned in the previous bullet points above. |
National Highways Scheme Delivery Framework 2 (SDF2) will play a pivotal role in renewing and enhancing England’s Strategic Road Network (SRN). Covering over 4,500 miles of motorways and major A roads, the SRN is a vital component of the UK’s transport infrastructure, carrying a third of all traffic and two-thirds of freight. SDF2 is designed to ensure this network remains dependable, durable, and safe, while also delivering value for money. SDF2 builds on the foundations of its predecessor frameworks - the original Scheme Delivery Framework (SDF) and the Pavement Delivery Framework (PDF). With an estimated value of £14.5 billion and a projected 8-year duration, SDF2 represents a significant investment in the future of the UK’s road infrastructure. The framework will focus on renewing and maintaining existing assets, with a strong emphasis on collaboration, standardisation, and productivity. It aims to focus spending on long-term asset improvements rather than temporary fixes, while simplifying commercial models to reduce administrative burden. SDF2 will be an enabled framework to facilitate usage by Lower Thames Crossing (LTC) and Maintenance and Response (M&R) suppliers. The new framework represents a forward-looking approach by National Highways aimed at delivering high-quality, efficient infrastructure projects that align with the evolving needs of stakeholders and road users. While the SDF has facilitated numerous successful projects across the SRN, the SDF2 is expected to build on this foundation with innovations and improvements that respond to emerging demands in safety, transport and sustainability. In late 2024, National Highways held an extensive round of preliminary market engagement, consisting of six face-to-face workshops and two online events, designed to incorporate input from the supply chain. The feedback gathered at market engagement informed the development of the SDF2 strategy, and material from the events can be found here: https://highways.sharepoint.com/:f:/s/NationalHighwaysProcurement-MaterialforExternalRelease/EjbLGgLNyFFKiYPsSEatBR4BI28Sv1e4-xZToGq2cfyZ9g?e=3Tx80E For more information on the operation of SDF2, please refer to the Information Memorandum.
This Lot 1 is for more complex Work Orders for which the Client requires a single prime supplier to both deliver (via self-delivery and sub-contracts) and manage schemes which could include any or all of the scope for other Lots (excluding the design Lots), including the option to deliver scheme(s) as design & build. The Lot covers the supply of products, materials, plant, equipment and people to carry out construction, removal activities and Framework Mobilisation. The procurement procedure for this Lot will be Process 1.
Published contracts in the last 12 months
186
total contracts
£8389.5m
total value
£55,929,877
average contract size
ETM Incursion Warning Radar System – Product Purchase including National Rollout
National Highways · WAC-494756
Maintenance and Response Contract (M&R) 2
National Highways · WAC-479833
National Highways Vehicle Recovery Service Contract (4th Generation)
National Highways · WAC-448384
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
14 November 2025
Closed
Estimated Value
£14,500,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →This Lot (2/NE) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.
This Lot (2/NW) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.
This Lot (2/SE) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.
This Lot (2/SW) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.
This Lot (2/M) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.
This Lot (2/E) covers the supply of products, materials, plant, equipment and people to carry out construction and removal activities, including: • highway drainage assets, • pipes, • ditches, • swales, • ponds, • the control and disposal of contaminated material, • associated technology works, • earthworks, • ducting, • kerbing, • footways, • rigid pavement, • retexturing of exposed concrete pavement, • site clearance, • brick, block and stonework, • piling, • temporary works required to ensure a safe method of working, • demolition, • structural steelworks, • reinforced earth abutments, • wingwalls, • retaining walls, • concrete, • asbestos removal (planned), • earthwork stabilisation, • counterfort drains, • soil nailing, • grounder anchors, • slope netting (rock and soil), • rock slope works including dowels, bolts, scaling, buttressing, dentition, shotcrete, and • ‘innovative’ stabilisation techniques, such as electrokinetic osmosis, fibre reinforced soil, soil mixing and the use of geosynthetics to reinforce soil. This Lot covers all works related to drainage as defined by series 500 of the “Manual of Contract Documents for Highway Works Volume 1 Specification for Highway Works” (or any subsequent iteration). This Lot covers delivery and management of all other Lot areas excluding Lot 1 (Main Contractor), Lot 4 (Tunnels), Lot 5.1 (Technology Design) and Lot 5.2 (Design). Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · undertaking the lead contractor role as required by any Work Order, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 2 is 20.
This Lot (3/NE) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.
This Lot (3/NW) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.
This Lot (3/SE) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.
This Lot (3/SW) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.
This Lot (3/M) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.
This Lot (3/E) covers: • highway maintenance, renewal, small improvements and associated services for pavements and • the supply of materials, plant, equipment and people to carry out surfacing and pavement construction operations including o bituminous and associated concrete pavement repairs, o surface restoration techniques, o planning, o paving, o retexturing, o high friction surfacing, o iron work adjustment and renewal, o cold applied ultra-thin surfacing (CAUTS), o hydraulically bound mixtures, o in-situ and ex-situ recycling, o loops and associated works, o footway surfacing and asphalt kerbing and o temporary works. Other duties This lot also includes the following activities · the delivery and management of works with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · undertaking the principal designer role as required by the Client (optional), · the delivery of incident response (rapid response), · pre-construction services, · early engagement, · community and · the provision of Urgent Works The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 3 is 15.
This Lot 4 covers the supply of materials, plant, equipment and people to carry out construction, commissioning, integrated commissioning, integrated testing and removal activities within and related to road tunnels, including the option to deliver scheme(s) as design & build. Scope includes but not limited to • electrical systems, • mechanical systems, • technology systems and • design and installation of temporary works. Suppliers may be provided with specialist technology assets by the Client. Other duties This Lot also includes the following activities • Framework Mobilisation, • mobilisation for the purpose of the activities set out above, • carrying out surveys, • fault finding and diagnostics, • pre-construction services, • early engagement, • undertaking the principal designer role as required by the Client, • undertaking the principal contractor role as required by the Client, • the provision of welfare facilities, • the delivery of incident response (rapid response), • the management of network occupancy, • community and • the provision of Urgent Works. The procurement procedure for this Lot will be Process 2.
This Lot (5.1/North) covers the design of highway maintenance, renewal and small improvement and associated services with a primary focus on technology including: • structures, • landscaping, • pavements, • drainage, • traffic modelling, • traffic signals, • geometrical designs, • geotechnics, • technology, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision and • stakeholder engagement/consultation. Other duties This Lot also includes the following activities: · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out above, · carrying out surveys (intrusive and non-intrusive), · pre-construction services, · early engagement, · undertaking the principal designer role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for both Sublots within Lot 5.1 is 8
This Lot (5.1/South) covers the design of highway maintenance, renewal and small improvement and associated services with a primary focus on technology including: • structures, • landscaping, • pavements, • drainage, • traffic modelling, • traffic signals, • geometrical designs, • geotechnics, • technology, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision and • stakeholder engagement/consultation. Other duties This Lot also includes the following activities: · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out above, · carrying out surveys (intrusive and non-intrusive), · pre-construction services, · early engagement, · undertaking the principal designer role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for both Sublots within Lot 5.1 is 8
This Lot (5.2/NE) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15
This Lot (5.2/NW) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15
This Lot (5.2/SE) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15
This Lot (5.2/SW) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15
This Lot (5.2/M) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15
This Lot (5.2/E) covers the design of highway maintenance, renewal and improvement and associated services. The primary focus is on non-technology assets including: • structures, • landscaping, • pavements, • drainage, • earthworks, • traffic signals and signs, • geometrical designs, • geotechnics, • lighting, • motorway communications, • environmental, • noise quality (including non-invasive surveys), • air quality (including non-invasive surveys), • vehicle restraint systems, • depots, • preparation of contract documents, • site supervision, • stakeholder engagement/consultation • non-technology schemes that have technology design. Other duties This Lot also includes the following activities; · Framework Mobilisation, · framework mobilisation for the purpose of the activities set out in above, · carrying out surveys (intrusive and non-intrusive), · early engagement, · design validation, · undertaking the principal designer role as required by the Client, · the management of network occupancy, · undertaking the role of technical advisor as required by the Client, · undertaking the role of independent works examiner as required by the Client, · modelling services (e.g. traffic and economic), · supporting governance submissions for both the Client and DfT, · creating business cases in line with the Treasury green book requirements, · land referencing, · planning submissions including development consent orders (DCO), · the delivery of incident response (rapid response), · demobilisation, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 1. The maximum number of suppliers to be invited to tender for all Sublots within Lot 5.2 is 15
This Lot (6/NE) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15
This Lot (6/NW) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15
This Lot (6/SE) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15
This Lot (6/SW) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15
This Lot (6/M) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15
This Lot (6/E) covers the design, supply of materials, plant and people and equipment for the: • installation, maintenance and removal of temporary traffic management, • installation, maintenance and removal of temporary safety barrier systems, • installation, maintenance and removal of temporary speed enforcement systems, • installation, maintenance and removal of temporary CCTV systems, • management of breakdown recovery services, • installation, maintenance and removal of temporary road markings and road studs and • removal of existing road markings and road studs. Other duties This Lot also includes the following activities: · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · early engagement, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy and · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 6 is 15
This Lot (7/NE) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15
This Lot (7/NW) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15
This Lot (7/SE) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15
This Lot (7/SW) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15
This Lot (7/M) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15
This Lot (7/E) covers the supply of materials, plant and people for the: • installation of temporary works, • application of maintenance painting systems including specialist corrosion protection systems, • removal, installation and repair of concrete on highway structures, • removal, installation and repair of concrete bridge parapets, • removal, installation and repair of bridge bearings and • remove, repair and installation of cathodic protection. Other duties This lot also includes the following activities · the delivery and management of works associated with or ancillary to the activities set out above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 7 is 15
This Lot (8/NE) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15
This Lot (8/NW) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15
This Lot (8/SE) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15
This Lot (8/SW) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15
This Lot (8/M) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15
This Lot (8/E) covers the supply of materials, plant and people for the installation, removal of and repair work to: • highways structure expansion joints, • waterproofing systems, • associated concrete repair, • testing of existing waterproofing systems, and • installation, maintenance and removal of any temporary works required to ensure a safe method of working. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out above · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 8 is 15
This Lot (9/NE) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20
This Lot (9/NW) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20
This Lot (9/SE) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20
This Lot (9/SW) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20
This Lot (9/M) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20
This Lot (9/E) covers the supply of materials, plant and people to carry out landscaping and ecology works including: • weed control, • wildlife control, • ground preparation, • seeding, • turfing, • boundary fencing, • planting, • watering, • tree and shrub maintenance, • creation and management of waterbodies as and any other ecological measures and • landscape clearance. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in section above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in section above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 9 is 20
This Lot (10/NE) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20
This Lot (10/NW) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20
This Lot (10/SE) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20
This Lot (10/SW) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20
This Lot (10/M) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20
This Lot (10/E) covers the supply of materials, plant and people for the installation and removal of: • highway road markings, • road studs, • installation and removal of temporary road markings and road studs, • high friction surfacing, • crack sealing and • pavement joint repair. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of the activities set out in above, · undertaking the principal contractor role as required by the Client, · pre-construction services, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 10 is 20
This Lot (11/NE) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20
This Lot (11/NW) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20
This Lot (11/SE) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20
This Lot (11/SW) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20
This Lot (11/M) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20
This Lot (11/E) covers the supply of materials, plant, products and people for the installation, removal and commissioning of: • road lighting and • traffic signs and other highway electrical equipment (excluding roadside technology assets). Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of section above, · pre-construction services, · elements of supplier design, · the provision of welfare facilities, · undertaking the principal contractor role as required by the Client, · the management of network occupancy, · temporary works, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 11 is 20
This Lot (12/NE) covers the supply of materials, plant and people for the: • installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20
This Lot (12/NW) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20
This Lot (12/SE) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20
This Lot (12/SW) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20
This Lot (12/M) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20
This Lot (12/E) covers the supply of materials, plant and people for the: installation and removal of road restraint systems (vehicle and pedestrian), • installation and repair of non-concrete bridge parapets, • push tests of existing road restraint systems, • temporary works and • installation and removal of highway fencing and environmental barrier. Other duties This Lot also includes the following activities: · the delivery and management of works associated with or ancillary to the activities set out in above, · design of their works (optional) · Framework Mobilisation, · mobilisation for the purpose of above, · pre-construction services, · undertaking the principal contractor role as required by the Client, · the provision of welfare facilities, · the management of network occupancy, · community and · the provision of Urgent Works. The procurement procedure for this Lot will be Process 2. The maximum number of suppliers to be invited to tender for all Sublots within Lot 12 is 20
Apply online