| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | SCOTTISH POWER UK PLC |
| Main Category: | Works |
| Procurement Method: | Negotiated procedure with prior call for competition |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| Not specified |
| Release Date: | 25 July 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-031c25 |
| Notice Reference: | 043171-2025 |
All 6 notices for this procurement, oldest first.
Bootle Kirkby Cable Civils & Installation
Hunterston 132kV Civil Works, GIS Building and Hunterston 400kV Modernisation Civil Works
Thornton North NR Feeder Station - Cable Civils & Installation Works
Windyhill 275kV Switchgear - Civil and Finishing Works
Glenglass GIS Extension Civil & Building Works
Cockenzie Cluster Inch Cape Connection - BOP/Civils Works
View Original Notice
Access the full notice on the official portal
| Award status: | Active |
Supply and install of a double underground duct cable system to accommodate a fully ducted 25kV cable double circuit system from SGT3B and SGT4B at Glenrothes 275kV substation to the new Network Rail 25kV Feeder Station feeder station at Thornton North. The route length will be approx. 10.5km. Installation, testing and pre-commissioning of single core 25kV 400mm2 Cu XLPE underground cables. Horizontal Directional Drilling (HDD) works across the river Leven. Provision of suitable backfill materials, ad-hoc concrete works, cable protection tiles, cable, warning tapes and temporary surface position markers for joint bay locations. Excavation works including their backfilling and permanent reinstatements. Cleaning of the cable duct along each section of the route to ensure installation of the cables. Provision as required, of all joint bays, cable draw pits, link box chambers, FO chambers and termination chambers for power and fibre-optic cables and accessories.
Published contracts in the last 12 months
13
total contracts
£6.0m
total value
£6,000,000
average contract size
Typical categories