| Source: | Find a Tender Service (FTS) |
| Notice Type: | Award notice |
| Buyer: | SCOTTISH POWER UK PLC |
| Main Category: | Works |
| Procurement Method: | Negotiated procedure with prior call for competition |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| Not specified |
| Release Date: | 3 June 2025 |
| Application Deadline: | — |
| Procurement ID (OCID): | ocds-h6vhtk-031c25 |
| Notice Reference: | 029452-2025 |
All 6 notices for this procurement, oldest first.
Bootle Kirkby Cable Civils & Installation
Hunterston 132kV Civil Works, GIS Building and Hunterston 400kV Modernisation Civil Works
Thornton North NR Feeder Station - Cable Civils & Installation Works
Windyhill 275kV Switchgear - Civil and Finishing Works
Glenglass GIS Extension Civil & Building Works
Cockenzie Cluster Inch Cape Connection - BOP/Civils Works
View Original Notice
Access the full notice on the official portal
Awarded to
| Award status: | Active |
Replace 19.429km of 132kV pressurised oil filled cables with 132kV non-pressurised XLPE solid cables Replace 19.429km of underground pilot wire with fibre optic cables Supply and install all ducting for the 132kV non-pressurised XLPE solid cables and fibre optic cables Complete all civils work (excavation, backfilling and reinstatement) associated with the installation Complete a single lane width reinstatement the length of the cable route (section approx. 1.8km) on the East Lancs road (A580) following the cable installation (Section 58 requirement) Scope of this work is for the cable civils only however we are optioning the cable installation costs. Replace existing outdoor sealing end structures at Bootle, Fazakerley and Gillmoss grid substations The existing modern non-pressurised XLPE solid cable sections along the two circuits including the outdoor sealing ends structures will be retained and reused. Drain, cut and cap of redundant oil filled cables and drain all associated oil tanks
Published contracts in the last 12 months
13
total contracts
£6.0m
total value
£6,000,000
average contract size
Typical categories