| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | THE ASSOCIATION OF NORTH EAST COUNCILS LIMITED |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
28 July 2025
Closed
Estimated Value
£500,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £500,000,000 |
| Estimated Value (inc. VAT): | £600,000,000 |
| Release Date: | 27 June 2025 |
| Application Deadline: | 28 July 2025 |
| Procurement ID (OCID): | ocds-h6vhtk-05048c |
| Notice Reference: | 035747-2025 |
All 10 notices for this procurement, oldest first.
NEPO210 Highway surfacing works
NEPO210 Highway surfacing works
NEPO210 Highways Surfacing Works
NEPO210 Highway Surfacing (Lots 1-9)
NEPO210 - Highway Surfacing Works (Lots 10-17)
Highway surfacing works
Highway surfacing works
NEPO210 Highways Surfacing Works
NEPO210 Highways Surfacing Works
NEPO210 Highways Surfacing Works
View Original Notice
Access the full notice on the official portal
| Call-off method: | Both: direct call-off and mini-competition |
The Association of North East Councils Ltd trading as the North East Procurement Organisation (NEPO) is seeking to establish a multi-contractor, multi-lot Framework for the provision of a highways surfacing works framework. This Framework offers Contracting Authorities access to Suppliers providing a diverse range Highway Surfacing Works. The works covered in the Framework have been split in to 18 lots: 1 Asphaltic Concrete 2 Grouted Macadam 3 Surface Dressing 4 Glass Fibre Reinforced Surface Dressing 5 Hot Applied High Friction Surfacing 6 Cold Applied High Friction Surfacing 7 Slurry Seal of Footways 8 Slurry Seal / Micro Asphalt of Carriageways 9 Carriageway in Full Depth Recycling 10 Carriageway Re-tread 11 Captive Shot Blasting - Mechanical Retexturing 12 Hydro blasting - Surface Retexturing 13 Patching 14 Alternative Patching Methods: Hot Applied 15 Alternative Patching Methods: Cold Applied 16 Road Markings 17 Surface Preservation: Penetrative 18 Surface Preservation: Non Penetrative The value of each lot is determined by dividing the framework value by the number of lots. While individual lots may exceed their calculated value, the total must not surpass the overall framework value. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products. Suppliers wishing to access and complete the tender documents must first register on Open the eTendering system using the following link https://www.open-uk.org. For guidance on how to create an account or submit your questionnaire response through Open, please visit https://www.open-hub.org/training (https://www.open-hub.org/training) to access the available Training Guides. If you need technical assistance from the Open Support team, this can be requested via email at open.support@nepo.org. PLEASE NOTE: Open is accessible 24/7 however, technical support is available Monday to Thursday 08:30 - 17:0 and Friday 08:30 - 16:30.
Asphaltic Concrete and Asphaltic materials must be supplied in accordance with and comply with National and European Standards, shall be transported and laid in accordance with the requirements of BS 594987:2024.
Contract period: — → 31 October 2033
Grouted Macadam must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).
Contract period: — → 31 October 2033
Surface dressing mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Glass Fibre Reinforced Surface Dressing mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Hot Applied High Friction Surfacing must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Cold Applied High Friction Surfacing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).
Contract period: — → 31 October 2033
Slurry Seal of Footways mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Slurry Seal/ Micro Asphalt of Carriageways must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Carriageway in Full Depth Recycling must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Carrigeway re-tread must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Captive Shot Blasting - Mechanical Retexturing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Hydro blasting - Surface Retexturing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.
Contract period: — → 31 October 2033
Patching must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).
Contract period: — → 31 October 2033
Alternative Patching Methods: Hot Applied must be supplied following the process specification The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).
Contract period: — → 31 October 2033
Alternative Patching Methods: Cold Applied must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).
Contract period: — → 31 October 2033
Road Markings must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 1200 with accompanying Notes for Guidance (MCHW 2) in NG1200, sets out the requirements for these materials. The following standards must be followed: Design Manual for Roads and Bridges - Volume 8 Section 2. BS EN 1436:2018, which specifies performance requirements for road markings. BS EN 1790:2013 Road marking materials. Pre-formed road markings. BS EN 1824:2020, which outlines requirements for conducting road trials of marking materials. BS EN 1871:2020 - covers physical properties of road marking materials.
Contract period: — → 31 October 2033
Surface Preservation: Penetrative must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).
Contract period: — → 31 October 2033
Surface Preservation: Non Penetrative must be supplied following the process specification The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials. The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).
Contract period: — → 31 October 2033
Document pack· 2 files
Published contracts in the last 12 months
22
total contracts
£17910.0m
total value
£1,628,181,818
average contract size
Typical categories
NEPO515 - Children's and Adult's Barristers
THE ASSOCIATION OF NORTH EAST COUNCILS LIMITED · WAC-512950
NEPRO x Financial Resilience
THE ASSOCIATION OF NORTH EAST COUNCILS LIMITED · WAC-453305
NEPO214 - GROUNDS MAINTENANCE EQUIPMENT & PLANT
THE ASSOCIATION OF NORTH EAST COUNCILS LIMITED · WAC-451670