Loading page content…
Loading page content…
| Source: | Contracts Finder |
| Notice Type: | Amendment |
| Buyer: | OFFICE OF RAIL AND ROAD |
| Main Category: | Services |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £51,000 |
| Release Date: | 4 August 2022 |
| Application Deadline: | 19 August 2022 |
| Procurement ID (OCID): | ocds-b5fd17-7693acbc-7942-4aeb-8356-70906ef1adf0 |
| Notice Reference: | 2e04ff08-6ecb-4572-a19d-2477e2cb4f8e-560716 |
All 4 notices for this procurement, oldest first.
Investigation into Unauthorised Structural Subsystems
View Original Notice
Access the full notice on the official portal
The ORR are aware of an issue where sub-systems have been brought into use without an Interoperability authorisation. The ORR want, on a NR Region basis the following; 1. The size of the issue determined (i.e the number of sub-systems brought into use without an authorisation where an authorisation was most likely required). 2. The significance of the issue in terms of regulatory compliance as well as future safety, quality and cost implications. 3. An evidenced opinion on the cause(s) of the issue. 4. An informed opinion on whether the issue is ongoing and whether NR are adequately addressing the issue. The scope shall include the following: • NR led and 3rd Party projects going back to 1st April 2017.Collecting evidence from Network Rail Sponsors, DEAM's and Capital Delivery Directors on current and previous construction projects dating back to 2017 with ORR authorisation tracker • Investigating a sample of infrastructure project completed, including but not exclusively 3rd party station projects dating back up to 5 years, use this a base line, collect statements from Network Rail • Investigating a sample of current projects in progress but not captured in ORR authorisation tracker • The consultant shall ensure the Network Rail and 3rd party owned projects receive equal scrutiny, we are interested to understand the relationship that both 3rd parties and Network Rail have with the authorisation process • Understanding relationship of ASPRO (Asset Protection and Optimisation) with 3rd parties • Understanding why any identified unauthorised works continued without a Network Change Notification • Investigating differences in process and acceptance between SRPs (System Review panel) across the regions to understand level of variability across the Network • Provide evidence of good and poor practices
Document pack· 5 files
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
19 August 2022
Closed
Estimated Value
£51,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
attachment