Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Highways England |
| Main Category: | Works |
| Procurement Method: | Competitive dialogue (above threshold) |
| Tender Status: | Complete |
| Estimated Value (ex. VAT): | £1,169,383,706.09 |
| Release Date: | 6 October 2022 |
| Application Deadline: | 30 July 2021 |
| Procurement ID (OCID): | ocds-b5fd17-4e3e45c5-c19c-49b3-b92c-31bcc464ec80 |
| Notice Reference: | ecd2158d-20bb-45b3-8ba3-f91225af228a-578260 |
All 2 notices for this procurement, oldest first.
A303 Amesbury to Berwick Down (Stonehenge)
A303 Amesbury to Berwick Down (Stonehenge)
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
The planning application for the A303 Stonehenge is still pending redetermination by the Secretary of State for Transport, following the quashing of the decision to grant the Development Consent Order (DCO). This contract will only become live once the Secretary of State has concluded the planning process and only if this process results in a DCO being granted. The requirements of the scheme that will be the responsibility of the successful applicant are principally captured in the following areas: 1. Design and construction of the new works; The scheme's new works includes the design and construction of the civil, mechanical, electrical and plumbing (MEP), technology and environmental components, key features of the new works are summarised below: - Tunnel: A twin-bore tunnel, approximately 2 miles (3.3 kilometers) long beneath the Stonehenge World Heritage Site, including tunnel portals and approach structures, tunnel service buildings and plant rooms, tunnel control system and mechanical, electrical and plumbing systems - Tunnel boring machine - design, manufacture, testing, shipping and on-site assembly - Carriageway works - Bridge works to form a viaduct over the River Till, an under bridge for the B3083, a flyover at the A345 Countess Roundabout, and 4 green bridges (Parsonage Down accommodation bridge, Winterbourne Stoke accommodation bridge, A360 Longbarrow Junction & green bridge No. 4) - Carriageway and tunnel technology - Landscaping and habitat creation - Extension of Parsonage Down National Nature Reserve - Protected species mitigation measures - Ensure rights of way and private means of access - Mainline earthworks - Utilities works 2. Refurbishment, replacement and modification of existing assets; There are works required on existing assets under the current ownership of both National Highways and Wiltshire Council. Continued engagement and consultation will be required with both parties throughout the design and construction phases for these elements including: - Existing A303 de-trunking works - Demolition works and site clearance works - Modification works to existing structures 3. Maintenance and operation during construction Maintenance and operation of the existing A303 within the site boundary will be required for the duration of the construction works. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities. 4. Post construction maintenance period There is an extended maintenance period (minimum of 5 years, maximum of 7 years) after construction to 'prove' the tunnel performs as intended. Maintenance is included as part of this period and the Contractor will be responsible for all elements of the infrastructure associated with the tunnel and its approaches. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities and tunnel operations.
National Highways Tree/Nurseries Market Engagement
Highways England · WAC-420479
Noise & environmental barriers - Request for Information ONLY
Highways England · WAC-280080
Social Value - Dynamic Purchasing System (DPS) for Social Enterprises Early Engagement
Highways England · WAC-280261
Pipeline status
Not addedContract imported automatically · AI writes the response
Application Deadline
30 July 2021
Closed
Estimated Value
£1,169,383,706.09
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →