| Source: | Contracts Finder |
| Notice Type: | Award notice |
| Buyer: | Corserv Limited |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
10 October 2023
Closed
Estimated Value
£50,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £50,000 |
| Release Date: | 24 November 2023 |
| Application Deadline: | 10 October 2023 |
| Contract Start Date: | 27 November 2023 |
| Contract End Date: | 15 November 2024 |
| Contract Duration: | 1.0 years |
| Procurement ID (OCID): | ocds-b5fd17-fb9e0481-335a-4717-a804-5035dcf253ad |
| Notice Reference: | f0ae1cbe-d0de-4a68-bdaa-4734226f9c3e-701411 |
All 2 notices for this procurement, oldest first.
Capital Drainage Filter Drain - A39 Treliver - Treluswell
Capital Drainage Filter Drain - A39 Treliver - Treluswell
Earlier notices predate the Procurement Act 2023 (commenced 24 Feb 2025) and therefore don't carry UK1–UK17 codes.
View Original Notice
Access the full notice on the official portal
Awarded to
| Award value: | £50,000 |
| Award decision date: | 23 November 2023 |
| Award status: | Active |
Corserv Solutions Ltd is seeking a competent and experienced contractor to carry out filter drain renewal across sites in Cornwall under an NEC3 Contract.\r \r Refreshing sections of existing highway filter drains at A39 Treliver - Treluswell Cornwall.\r Top 300mm of filter drain stone to be removed and cleansed in-situ to remove sediment and vegetation from the stone. Existing stone to be recycled on site and topped up with new 505B material where required.\r \r Specific Works Location and Restrictions Principal Road Network\r \r Site Specific Details All of the roads are part of our Principal Road Network which have embargos which have working time restrictions the most productive time is to carry out works at night.\r \r The intention is to award the works to the most economically advantageous tenderer based on 20% Quality and 80% Price.\r \r To access the question template and supporting documents please express an interest and then click the start my response button (found at the bottom right hand side of the page).