Appointment of Integrated Consultant Team for St Patrick’s Grammar School Armagh - Upgrade of Heating System
The St Patrick’s Grammar School Armagh project will consist of the upgrade of heating system, in accordance with DE handbooks and all relevant statutory Regulations. The successfully appointed Integrated Consultants Team shall undertake the procurement, appointment and management of the Contracting Team on behalf of the Employer and shall continue to manage and oversee the project through to all RIBA Stages 2-7.
View 2-notice timelineLatest notice released 7 Sept 2026
EducationPlanning
Appointment of Integrated Consultants Team for Jones Memorial Primary School, Enniskillen
The Jones Memorial Primary School, Enniskillen project will consist of the provision of Special and other Accommodation. Including traditional built extensions and internal refurbishments for the purpose of providing SEN accommodation and associated landscaping. In accordance with DE handbooks and all relevant statutory regulations.The successfully appointed Integrated Consultants Team (ICT) shall provide the professional services applicable to all RIBA Stages 2-7.
Appointment of Integrated Consultant Team for Longstone School
Appointment of Integrated Consultant Team for provision of new build for Longstone School, Dundonald MA26-0000M402, a proposed new 320 Pupil School. The successful ICT will work on a Traditional Design basis, to take the Project through RIBA Stages 0-7, with options to be investigated for both Traditional and Modern Methods of Construction for on-site delivery. This will involve a full professional design and management services for the project on the proposed site (options to be reviewed), complete with all site and landscape works including hard and soft play areas and future reconfiguration, extension or expansion capabilities.
Appointment of Integrated Consultants Team for Jones Memorial Primary School, Enniskillen
The Jones Memorial Primary School, Enniskillen project will consist of the provision of Special and other Accommodation. Including traditional built extensions and internal refurbishments for the purpose of providing SEN accommodation and associated landscaping. In accordance with DE handbooks and all relevant statutory regulations. The successfully appointed Integrated Consultants Team (ICT) shall provide the professional services applicable to all RIBA Stages 2-7.
Appointment of an Integrated Consultant Team for a New Build Special School in South Belfast (Belfast SEN03)
Appointment of a Project Manager led Integrated Consultant Team for a new build 500 pupil special school in South Belfast.
The Education Authority is seeking the procurement of an Integrated Consultant Team on a Traditional Design basis, to take the project through RIBA Stages 0-7, with options to be investigated for both Traditional and Modern Methods of Construction for on-site delivery.
This will involve full professional design and management services for the project on the proposed site (options to be reviewed), complete with all site and landscape works, including hard and soft play areas and future reconfiguration, extension or expansion capabilities. This may be subject to change during brief development.
ENQEIR993: Market Consultation - Embedded PV sample data
The objective of this Market Research is to search for suppliers capable of delivering a continuous feed of representative embedded PV generation data that meets the following outcomes:
1. Improve system visibility: Provide near real time insight into embedded PV output across Ireland and Northern Ireland.
2. Support operational forecasting: Enable EirGrid and SONI to better predict short term solar output changes by creating proxy forecasts for the locations of the data supplied by the tender winner(s) and then use the actual generation of the proxy sites to fine tune the actual forecast.
3. Provide a geographically representative dataset: Ensure broad dispersion and diversity of PV sites to reflect system-wide behaviour.
4. Deliver high data quality and reliability: Ensure data is accurate, validated, and free from distortions such as behind the meter battery interactions.
Appointment of Integrated Consultants Team for St Joseph’s College, Enniskillen
The St Joseph’s College, Enniskillen project will consist of the provision of Special and other Accommodation. Including a two-floor extension with external works and retaining wall. In accordance with DE handbooks and all relevant statutory Regulations. The successfully appointed Integrated Consultants Team ICT shall provide the professional services applicable to all RIBA Stages 2-7.
Appointment of an Integrated Consultant Team for a New Build Special School in South Belfast (Belfast SEN03)
Appointment of a Project Manager led Integrated Consultant Team for a new build 550 pupil special school in South Belfast.
The Integrated Consultant Team shall provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, architectural, quantity surveying, mechanical/electrical services and civil/structural engineering services for delivery of the proposed school project.
Appointment of Integrated Consultant Team for provision of new build for Longstone School, Dundonald
The aim of this project is to Appointment a Project Manager led Integrated Consultant Team for the provision of a
new build for Longstone School, Dundonald. The EA is seeking the procurement of an ICT on a Traditional Design basis, to take the project through RIBA Stages 0-7, with options to be investigated for both Traditional and Modern Methods of Construction for on-site delivery. This will involve full professional design and management services for the project on the proposed site (options to be reviewed), complete with all site and landscape works, including hard and soft play areas and future reconfiguration, extension or expansion capabilities. This may be subject to change during brief development.
NEC4 FRAMEWORKS FOR CONSULTANCY SERVICES IN CONNECTION WITH MINOR WORKS SCHEMES WITH A VALUE UP TO FIVE MILLION POUNDS FOR BELFAST, NORTHERN, SOUTH EASTERN, SOUTHERN AND WESTERN HEALTH AND SOCIAL CARE TRUSTS
The Contracting Authorities are seeking to engage up to fourteen Suppliers to provide consultancy services in connection with Minor Works Schemes under separate NEC4 Framework Contracts of up to four years duration subject to the satisfactory performance of the successful Suppliers and at the absolute discretion of the Contracting Authorities. The Supplier shall provide the following Services: Architect, Building Surveyor, Quantity Surveyor, Mechanical Services Engineer, Electrical Services Engineer, NEC4 Project Manager (to include NEC4 ECC Project Manager or Supervisor and NEC4 TSC or TSSC Clients Agent), Civil Engineer, Structural Engineer and Principal Designer. A detailed description of the services required for each discipline is set out in the PSP documentation. Minor works schemes may comprise new buildings, extensions to existing buildings, conversion/refurbishment of existing buildings, upgrade and replacement of building services, plant and equipment, feasibility and condition surveys, works to ensure compliance with various legislative requirements e.g. legionella, fire safety, DDA, asbestos regulations, mechanical and electrical engineering works and enabling works in advance of major works schemes.
Appointment of Integrated Consultant Team for St Patrick’s Grammar School, Armagh
The successfully appointed Integrated Consultants Team (ICT) shall provide the
professional services applicable to all RIBA Stages 0-7 through Traditional Construction.
As part of the Technical Feasibility Study, St Patricks VG school
Floor area: The Limit of Internal Area is circa. As existing footprint sqm.
Full Schedule of accommodation will be issued with the Stage 1 documentation.
Site Provisions: The project will incorporate heating replacement system to meet all DE handbook requirements for a school of this size. Attached drawing will also form part of the overall scope.
Appointment of Integrated Consultants Team for St Joseph’s College, Enniskillen
The St Joseph’s College, Enniskillen project will consist of the provision of Special and other Accommodation. Including a two-floor extension with external works and retaining wall. In accordance with DE handbooks and all relevant statutory Regulations.
The successfully appointed Integrated Consultants Team (ICT) shall provide the
professional services applicable to all RIBA Stages 2-7.
ANDBC Appointment of an Integrated Consultancy Team for the Redevelopment of Bangor Marina and Harbour Wetside Facilities under Bangor Waterfront Redevelopment
The Contracting Authority is developing a long-term vision for the Redevelopment of Bangor Waterfront. The vision is to turn Bangor into a ‘destination of choice’, as a place to live, work, visit, study and invest, through a series of interconnected developments and experiences along Bangor Waterfront. In partnership with Belfast Region City Deal, the Department for Communities and key stakeholders, Ards and North Down Borough Council is progressing plans to redevelop a 2 mile stretch of Bangor Waterfront between Skippingstone Beach (near Pickie Fun Park) and Banks Lane, Ballyholme to re-establish Bangor as a thriving seaside location and prime visitor attraction in Northern Ireland. The Redevelopment of Bangor Marina and Harbour Wetside Facilities was one of the constituent projects within the Bangor Waterfront Redevelopment programme recommended within the outline business case. Therefore, the services required under this contract are for the design and delivery of the Redeveloped Marina and Harbour Wetside Facilities. Bangor Marina and Harbour is located on the southern shore of Belfast Lough, within the city of Bangor, County Down. Bangor is Northern Ireland’s third largest urban settlement, with an estimated catchment population of approximately 170,000 within a 20-minute drive and around 475,000 within 30 minutes. In May 2022, the town was granted City status as part of the Queen’s Platinum Jubilee Celebrations. Situated at the heart of Bangor’s seafront, the Marina is one of Northern Ireland’s premier marine leisure facilities, with an established reputation as a Blue Flag and 5-Gold Anchor award-winning marina. It acts as a gateway for domestic and international vessels arriving into Northern Ireland and is a central feature of Bangor’s visitor offering and waterfront identity. The redevelopment site for this project is focused solely on the wetside infrastructure of the marina and harbour, including (but not limited to) pontoons, berthing systems, service connections, access routes and associated in-water infrastructure. Please note that landside buildings, operational facilities and the surrounding public realm do not fall within the scope of this project and are being progressed separately under the Urban Waterfront and Public Realm (UWPR) project, also funded through the Belfast Region City Deal. The site is located at Bangor Marina, Quay Street, Bangor, BT20 5ED.
Appointment of Integrated Consultant Team for New Build at St Columban’s Primary School, Kilkeel
The provision of an Integrated Consultant Team (ICT) to develop the Employer’s Brief in
relation to the design and delivery of a new St Columban’s Primary School. The ICT shall
develop the design and complete the RIBA (2020) Stage 4 Technical Design before
appointing a Contracting Team to undertake the construction of the new St Columban’s
Primary School. The ICT shall undertake the procurement, appointment and management
of the Contracting Team on behalf of the Employer and shall continue to manage and
oversee the project through the remaining stages of the RIBA 2020 Plan of Work 5-7.