T26-053CAP Melvin Arena Floodlighting Consultants ITT
It is the intention of Derry City and Strabane District Council, as the Employer, to appoint a Civil/Structural Engineer or Mechanical and Electrical Engineer led Integrated Consultancy Team (ICT) to undertake all the required design, secure all the necessary statutory approvals and undertake the management of all the construction works with regards to the design and delivery of the “Melvin Arena Floodlighting” capital project, (based in Strabane, Co Tyrone) as per the ITT information; Project No. HC-24-01, Tender Reference No. T26-053CAP. Working in close consultation with the Employer the ICT will be required to provide design proposals (including revisions) that meet the strategic aims and objectives of the Council and to manage the specified works within quality, budget and programme requirements. Your submission must be submitted via EtendersNI, via this CFT. No other method of submissions will be accepted. Please refer to the CfT documents for further detail.
Derry City and Strabane District CouncilNorthern IrelandWAC-590084
Microscopes for Western Health and Social Care Trust Haematology Consultants
The Business Services Organisation (BSO) Procurement and Logistics Service (PaLS), on behalf of the Buyer, Western Health and Social Care Trust in Northern Ireland, are inviting the market to provide information on the supply and delivery of microscopes for their Haematology Consultants based in Altnagelvin Hospital. The Haematology laboratory's main purpose is to diagnose blood related conditions and ensure safe, efficient blood transfusion support, contributing directly to patient care across the hospital and wider community. With this diagnostic service, the department ensures timely results essential for treatment decisions.
Business Services Organisation Procurement and Logistics ServiceNorthern IrelandWAC-597900
***PME EXERCISE***Consultancy Services of an Interdisciplinary Consultancy Team to progress an update of Tannaghmore Farm Master Plan (2016)
Armagh City Banbridge and Craigavon Borough Council ABC is currently preparing to initiate a procurement process to establish a contract with an experienced Master Planning Interdisciplinary Consultancy Team to progress an update of the Tannaghmore Farm Master Plan (2016) , through to RIBA 1-2 and including the full business case approval process. Prior to initiating the procurement, ABC Climate Sustainability Parks Department wishes to establish the level of market interest in participating in the procurement process.
Armagh City, Banbridge and Craigavon Borough CouncilNorthern Ireland5 Jun 2026WAC-595988
The contract is for the provision of Phase 1 of a new surface level car park of 93 spaces with 1.1 M. high paladin perimeter fence and amenity lighting for Leafair Community Centre and playing fields. Development includes a new vehicular access on Lenamore Road, Derry with automatic barrier, signage, and a new ramped access and steps to the Community Centre. ICT will include the following consultants and services as a minimum: • Lead Consultant (Civil Engineer or NEC 4 Project Manager) • NEC 4 Project Manager • Landscape Architect • Civil Engineer • Principal Designer • Site Supervisor • Cost Consultant/Quantity Surveyor • Any other consultant the Lead Consultant deems necessary to complete the scope of services required for the successful completion of this commission. The commission will comprise all services necessary to deliver Phase 1 of the project from the current RIBA stage 4. Your submission must be submitted via EtendersNI, via this CFT. No other method of submissions will be accepted. Please refer to the CfT documents for further detail.
Derry City and Strabane District Council19 Jun 2026WAC-599070
ANDBC Appointment of an Integrated Consultancy Team for the Redevelopment of Bangor Marina and Harbour Wetside Facilities under Bangor Waterfront Redevelopment
The Contracting Authority is developing a long-term vision for the Redevelopment of Bangor Waterfront. The vision is to turn Bangor into a ‘destination of choice’, as a place to live, work, visit, study and invest, through a series of interconnected developments and experiences along Bangor Waterfront. In partnership with Belfast Region City Deal, the Department for Communities and key stakeholders, Ards and North Down Borough Council is progressing plans to redevelop a 2 mile stretch of Bangor Waterfront between Skippingstone Beach (near Pickie Fun Park) and Banks Lane, Ballyholme to re-establish Bangor as a thriving seaside location and prime visitor attraction in Northern Ireland. The Redevelopment of Bangor Marina and Harbour Wetside Facilities was one of the constituent projects within the Bangor Waterfront Redevelopment programme recommended within the outline business case. Therefore, the services required under this contract are for the design and delivery of the Redeveloped Marina and Harbour Wetside Facilities. Bangor Marina and Harbour is located on the southern shore of Belfast Lough, within the city of Bangor, County Down. Bangor is Northern Ireland’s third largest urban settlement, with an estimated catchment population of approximately 170,000 within a 20-minute drive and around 475,000 within 30 minutes. In May 2022, the town was granted City status as part of the Queen’s Platinum Jubilee Celebrations. Situated at the heart of Bangor’s seafront, the Marina is one of Northern Ireland’s premier marine leisure facilities, with an established reputation as a Blue Flag and 5-Gold Anchor award-winning marina. It acts as a gateway for domestic and international vessels arriving into Northern Ireland and is a central feature of Bangor’s visitor offering and waterfront identity. The redevelopment site for this project is focused solely on the wetside infrastructure of the marina and harbour, including (but not limited to) pontoons, berthing systems, service connections, access routes and associated in-water infrastructure. Please note that landside buildings, operational facilities and the surrounding public realm do not fall within the scope of this project and are being progressed separately under the Urban Waterfront and Public Realm (UWPR) project, also funded through the Belfast Region City Deal. The site is located at Bangor Marina, Quay Street, Bangor, BT20 5ED.
Appointment of Integrated Consultant Team for New Build at St Columban’s Primary School, Kilkeel
The provision of an Integrated Consultant Team (ICT) to develop the Employer’s Brief in
relation to the design and delivery of a new St Columban’s Primary School. The ICT shall
develop the design and complete the RIBA (2020) Stage 4 Technical Design before
appointing a Contracting Team to undertake the construction of the new St Columban’s
Primary School. The ICT shall undertake the procurement, appointment and management
of the Contracting Team on behalf of the Employer and shall continue to manage and
oversee the project through the remaining stages of the RIBA 2020 Plan of Work 5-7.
Further Education (FE) Colleges Integrated Consultant Team Framework 2026
This procurement is for the provision of the Further Education (FE) Colleges Integrated
Consultant Team Framework 2026 for the Contracting Authorities. This includes the
provision of professional services delivery for minor works projects to include – quantity
surveying services, project management & design services, cost management services,
business case preparation, tender documentation preparation, architectural services, civil
and structural engineering services, mechanical and electrical engineering services and
Environmental/Sustainability Engineering Services.
CPD’s Construction Information Management System (CIMS) is a cloud-based
collaboration platform which may be used by Clients, CPD Construction Professionals,
and Suppliers in the delivery of government infrastructure projects.
The platform is built upon the Asite common data environment, with bespoke
development to suit CPD requirements for quality assurance throughout the procurement
lifecycle.
All information relating to this procurement has been developed and stored within CIMS.
All documents for this procurement are available for Suppliers to view and download from
a Data Room, a publicly accessible folder in CIMS, which may be accessed at the
following link:
https://adoddleak.asite.com/lnk/jroXo6Hk5rdEBU7Cp99
The Supplier should download documents to their desktop to review and/or complete as
required. The completed TSP should be submitted in accordance with Section 5 of this
document.
Access to the public folder shall remain open until the Framework Agreement has been
awarded.
Appointment of an Integrated Consultant Team for Gaelscoil Éadain Mhóir Primary School including a Single Nursery Unit
To appointment a Project Manager led Integrated Consultant Team for the delivery of a new state of the art teaching environment for Gaelscoil Éadain Mhóir Primary School including a single Nursery Unit at Lecky Rd, Derry/Londonderry BT48 6NP. The Integrated Consultant Team shall provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of theproposed School project. Full Team required to include a Modern Methods of Construction Specialist sub consultant.
Appointment of an Integrated Consultant Team for Gaelscoil Éadain Mhóir Primary School and single Nursery Unit.
Appointment of a Project Manager led Integrated Consultant Team for the delivery of the replacement of Gaelscoil Éadain Mhóir Primary School and single Nursery Unit at Lecky Rd, Derry/Londonderry BT48 6NP.
The Integrated Consultant Team shall provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of the proposed School project. Full Team required to include a Modern Methods of Construction Specialist sub consultant.
Appointment of Integrated Consultant Team for provision of new build for Longstone School, Dundonald
Appointment of a Project Manager led Integrated Consultant Team for the provision of a new build for Longstone School, Dundonald. The Integrated Consultant Team shall provide full professional services for RIBA Plan of Work 2013 Stages 0-7 to include project management, provision of architectural, quantity surveying, structural, services engineering, civil and structural services for delivery of the proposed New Build Special School project.
Collaborative strategic consultancy support on a wide range of matters aligned to Queen's Strategy 2030 goals including: strategic planning, delivery and monitoring, benchmarking and horizon scanning.
Queen's University BelfastNorthern IrelandWAC-577186