An Open Framework to facilitate the supply of bulk construction materials to Terra Nova, Great Places Housing Group's in-house new build construction arm. Terra Nova intends that the Open Framework scheme of frameworks will endure for eight years, with annual iterations re-opening the Open Framework to competition, providing for potential new entrants, and that orders will be called off on a scheme by scheme basis, either with or without further competition.
Initial Categories will include: Bulk Bricks, Bulk Blocks, Bulk First & Second Fix Joinery Timber
View 5-notice timelineLatest notice released 19 Oct 2026
Private SectorTender 3 notices
Non-Residential Construction
PfH are seeking to implement a Dynamic Purchasing System (DPS) for non-residential building construction. The intent is that the DPS will support our members to deliver non-residential new and refurbished buildings including the use of traditional and modern Methods of construction. Further details are contained within the associated project documents, which will be available to download once an expression of interest has been lodged.This Framework may be used by any contracting authority listed in or referred to in the FTS Notice. This includes: All current members of PfH at the time of the FTS
View 3-notice timelineLatest notice released 31 Jan 2029
Public SectorTender
Construction purchasing system
EMH are launching a dynamic purchasing system (DPS) for construction of homes in the East Midlands region. You can find out more, and apply at the below link: https://www.emh.co.uk/work-for-us/construction-purchasing-system/
RAD226 - SOCIAL HOUSING CONSTRUCTION PROJECT AT WOODSIDE ROAD, DERRY
Woodside Road, Derry/Londonderry
The proposed construction works contract is for the construction of a residential development on a greenfield site on the Woodside Road, Derry/Londonderry. The works is for the provision of 57 social housing units that includes a housing mix of 45 homes including split level units, 4 wheelchair accessible homes and 8 apartments including 1 wheelchair accessible. The site also includes extensive landscaping, a children's play park, amenity space and other ancillary works. Alongside the 57 units, a programme of site wide enabling works will also be undertaken.
The complexity of this development includes site clearance, site remodelling due to site topography, utility alterations, construction of a bus turning circle and detailed phasing requirements.
It is expected ALL social housing units built under this contract will achieve Secured by Design and Lifetime Homes accreditation. All units will also be required to achieve EPC Rating 'A'. The project will also be delivered to BIM Level 2.
A Planning Application, reference LA11/2022/0681/F, for the project was submitted to Derry City & Strabane District Council in June 2022. Full approval is expected in the coming months.
The contract will be for approximately 24-months from date of award and is scheduled to start in March 2027 with the ITT documentation being issued in December 2026.
Time is to be of the essence in delivering the works and any failure by the Contractor to comply with the time limits for commencing or completing the works shall be deemed to be a substantial failure by the Contractor to comply with the contract giving the Employer a right to terminate the contract.