Construction of Revoe Community Sports Facilities Development
Blackpool Council is looking to appoint a Supplier for the delivery of 2 x 7-a-side 3G Football Pitches, 1 x Multi Use Games Area, 2 x Padel Courts and associated landscaping. The site is adjacent to Blackpool Football Club, off Seasiders Way, Blackpool. The scheme is at RIBA Stage 3, and Blackpool Council will engage a Lead Consultant who will continue to be employed by Blackpool Council throughout the duration of the works through to completion. A planning application was submitted in April 2026, and a decision is due to be confirmed at the beginning of September 2026. The Contracting Authority wishes to appoint a Supplier who can clearly demonstrate the ability to meet our requirements and who offers the most advantageous tender.
Stage 1 - Request to Participate (RtP)
The first stage of this Procurement Procedure requires that you complete a Procurement Specific Questionnaire (PSQ). The PSQ is designed to capture core information and provide the Contracting Authority with sufficient information to select (short-list) a suitable number of capable Suppliers who will be invited to proceed to the next stage of the Procurement Procedure.
Only Requests to Participate which satisfy all conditions of participation will be eligible for consideration to be invited to the next stage of the Procurement Procedure.
In line with Regulation 85 subsection 3 of the Procurement Act 2023 this below threshold works tender is being conducted under a two-stage process.
The contract shall comprise of lotted reactive repairs and void property works split into specific trades in connection with existing Shettleston Housing Association residential stock.
The contract shall comprise of lotted reactive repairs and void property works split into specific trades in connection with existing Shettleston Housing Association stock.
View 2-notice timelineLatest notice released 18 Sept 2026
Private SectorUpdate 5 notices
Property Maintenance & Construction Materials
Great Places Housing Group (GPHG) operates a warehouse Distribution Centre in Trafford Park, Manchester, through which it provides building repairs and other materials to repairs and grounds maintenance operatives and other staff as required.
These materials may be distributed out of the warehouse, delivered direct to site, or picked up by operatives from suppliers' premises as appropriate.
GPHG is establishing an open framework for the provision of these goods, made up of 11 Lots defined by the category of goods required.
GPHG expects that Lots will likely be re-opened at different frequencies (for instance, high volume & high cost lots may be re-opened annually, whilst other may be re-opened bi- or tri- annually).
View 5-notice timelineLatest notice released 21 Sept 2026
Local GovernmentTender
Minor Construction Works and Maintenance Dynamic Purchasing System (DPS)
Nottinghamshire County Council on behalf of Mansfield District Council (MDC) (The Council) is seeking to establish a provider list, using a Dynamic Purchasing System (DPS), of contractors able to provide the delivery of Minor Construction Works in North Nottinghamshire.
Contractors under this DPS will also be accessible to meet the requirements of Ashfield District Council (MDC), Rushcliffe Borough Council (RBC) and Broxtowe Borough Council (BXBC) for these services outlined within this DPS.
Contractors will be expected to work closely with The Council to fulfil the requirements for maintaining public health and safety and protecting property which is core to the delivery of these services.
Nottinghamshire County CouncilEast MidlandsWAC-26606
Modular Offsite Construction (Supply of New Build Dwellings)
Procurement Assist Limited is seeking service providers to take part in tendering for a place on a 60 month Dynamic Purchasing System for Modular Offsite Construction (Supply of New Build Dwellings).
The DPS will be available for use by iFM Bolton and the whole public sector from across the United Kingdom. The DPS initial application period is 30 days but will remain open until 31 May 2025. Applications from service providers can be made at any time during this period.
The DPS is intended to be a fast route to market for Clients, with Clients not needing any further engagement with OJEU procurement processes.
Procurement Assist is publishing this Notice of Amendment made pursuant to the original Notice 2020/S 082-194732 to extend the DPS to 31 May 2029. The remaining information in relation to this DPS is unchanged.
New Build Contractors (Offsite Construction, Delivery & Install)
Procurement Assist Limited is seeking service providers to take part in tendering for a place on a 60 month Dynamic Purchasing System for New Build Contractors (Offsite Construction, Delivery & Install)
The DPS will be available for use by iFM Bolton and the whole public sector from across the United Kingdom. The DPS initial application period is 30 days but will remain open until 31 May 2029. Applications from service providers can be made at any time during this period.
The DPS is intended to be a fast route to market for Clients, with Clients not needing any further engagement with OJEU procurement processes.
Procurement Assist is publishing this Notice of Amendment made pursuant to the original Notice 2020/S 084-199965 to extend the DPS to 31 May 2029. The remaining information in relation to this DPS is unchanged.
Modular Offsite Construction (Supply of New Build Dwellings)
Procurement Assist Limited is seeking service providers to take part in tendering for a place on a 60 month Dynamic Purchasing System for Modular Offsite Construction (Supply of New Build Dwellings).
The DPS will be available for use by iFM Bolton and the whole public sector from across the United Kingdom. The DPS initial application period is 30 days but will remain open until 31 May 2025. Applications from service providers can be made at any time during this period.
The DPS is intended to be a fast route to market for Clients, with Clients not needing any further engagement with OJEU procurement processes.
Procurement Assist is publishing this Notice of Amendment made pursuant to the original Notice 2020/S 082-194732 to extend the DPS to 31 May 2029. The remaining information in relation to this DPS is unchanged.
New Build Contractors (Offsite Construction, Delivery & Install)
Procurement Assist Limited is seeking service providers to take part in tendering for a place on a 60 month Dynamic Purchasing System for New Build Contractors (Offsite Construction, Delivery & Install)
The DPS will be available for use by iFM Bolton and the whole public sector from across the United Kingdom. The DPS initial application period is 30 days but will remain open until 31 May 2029. Applications from service providers can be made at any time during this period.
The DPS is intended to be a fast route to market for Clients, with Clients not needing any further engagement with OJEU procurement processes.
Procurement Assist is publishing this Notice of Amendment made pursuant to the original Notice 2020/S 084-199965 to extend the DPS to 31 May 2029. The remaining information in relation to this DPS is unchanged.
Expression of Interest: Refurbishment and upgrade of Community Hub roof, refurbishment of 2No. toilet blocks and construction of new toilet facilities
Refurbishment of Community Hub roof and replacement fascias, barges and gutters with extension of existing fencing to yard. Refurbishment of Cory toilets and Railway toilets. Construction of new toilet block at Lawn's car park at Padstow, Cornwall. The works are due to be undertaken during the fourth quarter (Q4) of 2026. Expressions of interest should be sent to the Town Clerk by email [email protected]
The tender documents are due to be issued to the selected contractors W/C 17 August 2026 with a four-week tender period.
Expression of Interest: Refurbishment and upgrade of Community Hub roof, refurbishment of 2No. toilet blocks and construction of new toilet facilities
Refurbishment of Community Hub roof and replacement fascias, barges and gutters with extension of existing fencing to yard. Refurbishment of Cory toilets and Railway toilets. Construction of new toilet block at Lawn's car park at Padstow, Cornwall. The works are due to be undertaken during the fourth quarter (Q4) of 2026. Expressions of interest should be sent to the Town Clerk by email [email protected]
The tender documents are due to be issued to the selected contractors W/C 17 August 2026 with a four-week tender period.
NRW Forestry Infrastructure Construction & Maintenance FWA 2026
A pipeline notice for NRW Forestry Infrastructure Construction & Maintenance FWA 2026. This framework will cover the whole of Wales and be split into 4 geographical lots:
North Wales, Mid Wales, South West and South East Wales.
Constructing West Midlands - Hard Facilities Management Framework
Acivico's Constructing West Midlands team are procuring a Framework (CWM FM) for all types of Hard Facilities Management Works and Services. CWM FM will deliver Compliance Programmes, Planned Periodic Maintenance (PPM), Routine Responsive Maintenance (RRM) and Minor Maintenance Works (MMW) to a range of public sector clients primarily across the Greater West Midlands region.
The scope of works and services will include all Building and Mechanical and Electrical (M&E) maintenance and repair requirements, including individual reactive Minor Works projects up to approximately £500,000 in value. This will include the Principal Designer and Principal Contractor roles relating to the works under management.
Contractors are invited to participate in a market engagement process with CWM by completing an early market engagement questionnaire. The information provided by suppliers will be used to help inform the framework design and procurement strategy. CWM reserve the right to hold further market engagement with selected respondents, which may include in person or online events at CWMs discretion.
This Framework is being established to be particularly suitable for small and medium sized enterprises (SMEs). Contractors interested in participating in the procurement process are advised that they must have experience of undertaking Principal Designer or Principal Contractor roles either directly or through their supply partners in order to meet the conditions of participation.
It is intended that CWM FM will be a closed framework agreement and that it will be tendered in Lots, with multiple suppliers per Lot.
This notice is for information only and CWM and Acivico reserve the right not to proceed to tender or at their absolute discretion to amend the details at the time of issue of any further notice(s) at any other time.
ACIVICO (DESIGN, CONSTRUCTION AND FACILITIES MANAGEMENT) LIMITEDWAC-608471