Car Park Construction and Associated Works for Modular Budlings
The current welfare facilities for the Refuse Staff are deemed inadequate due to the existing age of the existing Portakabin on site and general lack of provision with staffing increases and as such this Tender opportunity is intended to provide improved staff parking and associated works for the provision of new modular building welfare and training facilities
Construction of New Fire Training Building at the Joint Training Centre
Derbyshire Police Fire Partnership LLP is seeking to award a Contract for the provision of the Construction of a New Fire Training Building at the Joint Training Centre, as detailed in the Invitation to Tender Statement of Requirements.
The Police and Crime Commissioner for DerbyshireWAC-694160
Minor Construction Works and Maintenance Dynamic Purchasing System (DPS)
Nottinghamshire County Council on behalf of Mansfield District Council (MDC) (The Council) is seeking to establish a provider list, using a Dynamic Purchasing System (DPS), of contractors able to provide the delivery of Minor Construction Works in North Nottinghamshire.
Contractors under this DPS will also be accessible to meet the requirements of Ashfield District Council (MDC), Rushcliffe Borough Council (RBC) and Broxtowe Borough Council (BXBC) for these services outlined within this DPS.
Contractors will be expected to work closely with The Council to fulfil the requirements for maintaining public health and safety and protecting property which is core to the delivery of these services.
Nottinghamshire County CouncilEast MidlandsWAC-26606
Construction of New Link Corridor & Associated Works Boston Leisure Centre Phase 2
Boston Borough Council, (the Authority) are undertaking a Preliminary Market Engagement (PME) exercise to inform the future procurement of a construction works contractor to deliver a single storey link corridor extension and associated works at an existing leisure centre known as Geoff Moulder Leisure Centre in Boston, Lincolnshire.
The work will comprise of sub-structure (piled foundations & floor slab) brick and blockwork super structure, flat roof and associated windows and doors. The corridor will be fitted out and comprise a basic M&E package. Associated works will include some internal remodelling and upgrade to an existing gym and spa area. The proposed link corridor and associated work forms part of a larger project, some elements of which are already commissioned and are on site at the time of writing.
Framework for Drilling, Borehole Construction and Associated Works and Services
The Mining Remediation Authority requires a framework agreement for the provision of services relating to the construction and rehabilitation of boreholes in former mining areas to support the objective to understand water levels and chemistry. The services are anticipated to include borehole drilling, construction, maintenance, cleaning, rehabilitation and associated works/services.
The drilling will be predominately coal measures and overlying strata including regionally important aquifers (may need casing off). The targets will often be specific mining features, both void and collapsed. Drilling may be required in areas where multiple sets of workings are present which may create challenges. Targets and strata above and in the zone of influence of workings may be collapsed and/or fractured due to the effects of mining. Accuracy and verticality of borehole drilling will be of high importance as targets are often small and at many hundreds of metres depth. The future survey/sampling/pumping requirements for the boreholes makes verticality important for both targeting of underground features and their operational purpose.
Leicester City Council (LCC) would like to seek views and engagement from the market in relation to the construction of 33 new build council homes. It is intended that homes will be built on the former site of Forest Lodge Education Centre (FLEC), which has now been demolished. The tender opportunity is likely to be run as an open tender exercise and use the NEC Option A as the form of contract.
This exercise is NOT a call for competition and is purely a pre-market engagement exercise. The purpose of this PME exercise is to gauge market interest and capacity.
Interested contractors should express their interest through the Microsoft Forms questionnaire link (https://forms.cloud.microsoft/e/Mggy2vHwnA) and answer the questions as required. The deadline to respond to the questionnaire is 12 noon on 15 October 2026. Failure to respond to the PME questionnaire will not affect interest parties being considered for any future opportunity.
Scape Procure Limited (trading as SCAPE) is establishing a framework agreement for the provision of construction works and services throughout England, Wales, and Northern Ireland.
This framework includes the following Lots:
Lot 1 - England | Construction Works & Services
Lot 2 - England | Residential Construction Works and Services: Decarbonisation, Retrofit, Repair & Maintenance
Lot 3 - Wales | Construction, Housing, Works & Services
Lot 4 - Northern Ireland | Construction, Housing, Works & Services £0-£15m
Lot 5 - Northern Ireland | Construction, Housing, Works & Services £10m+
This procurement is establishing a multi-party framework with fifteen (15) Suppliers (3 on each Lot). The minimum annual turnover requirement for each Supplier (including their Associated Suppliers) is required to be:
Lot 1 - £150m per annum.
Lot 2 - £75m per annum.
Lot 3 - £75m per annum.
Lot 4 - £20m per annum.
Lot 5 - £75m per annum.
SCAPE intends to design this framework to facilitate SME engagement via the successful Bidder's supply chain and is also open to accepting bids from consortia or JVs of which SMEs may form a part.
The common procurement vocabulary codes stated are deemed to include, for the avoidance of doubt and unless otherwise stated, the category and sub-category codes below the CPV codes stated, e.g. 45200000 Works for complete or part construction and civil engineering work is deemed to include 45210000 Building construction work and 45214000 Construction work for buildings relating to education and research.
The successful delivery partners will be expected to work collaboratively with public sector clients, in-house and external consultants, and other partner providers. All contract performance will be monitored using a set of comprehensive performance indicators. Services shall be delivered by the successful delivery partners and their supply chain where applicable.
All services will be performed in accordance with the framework agreement and a delivery agreement executed in accordance with this agreement. For each Lot, SCAPE will shortlist the top five (5) highest scoring bidders at PSQ stage and invite them to tender.
SCAPE confirms that a conflicts assessment has been prepared in accordance with Section 83 of the Procurement Act 2023. The conflicts assessment will be updated and revised at each future stage of the procurement where appropriate, and action will be taken to remove or mitigate conflicts where any arise.
SCAPE recognises that, as a national framework, it requires considerable investment in people, processes, and systems to create and manage expert, local, and responsive supply chains. With this is mind, a maximum framework duration has been set at 6 years.
To respond to this opportunity, please click here:
https://www.delta-esourcing.com/respond/HVTVQVREKT
(https://www.delta-esourcing.com/respond/HVTVQVREKT )