NNLC484D - Operations, Site Work and Facilities Management Dynamic Purchasing System
United Kingdom National Nuclear Laboratory (UKNNL) intends on establishing a DPS route to market for the Operations, Site Work and Facilities Management requirement, across 8 Lots.
Site Preparation
Building and Facility Construction and Maintenance Services
Industrial Production and Manufacturing Services
Heating, Ventilation and Air Conditioning
Mechanical and Electrical, Control and Instrumentation
Hazardous Waste
Asbestos, Waste Removal, Surveys and Remediation
Access, Lifting and Maintenance
United Kingdom National Nuclear LaboratoryNorth WestWAC-346880
Operations, Site Work and Facilities Management Dynamic Purchasing System
United Kingdom National Nuclear Laboratory (UKNNL) intends on establishing a DPS route to market for the Operations, Site Work and Facilities Management requirement, across 8 Lots.
Site Preparation
Building and Facility Construction and Maintenance Services
Industrial Production and Manufacturing Services
Heating, Ventilation and Air Conditioning
Mechanical and Electrical, Control and Instrumentation
Hazardous Waste
Asbestos, Waste Removal, Surveys and Remediation
Access, Lifting and Maintenance
United Kingdom National Nuclear LaboratoryNorth WestWAC-30650
View 3-notice timelineLatest notice released 8 Jan 2029
Private SectorPlanning
Split Butterfly Valve for Powder Transfer Applications
UKNNL are seeking expressions of interest from suppliers capable of providing a split butterfly valve system suitable for powder handling and transfer operations.
Minimum Technical Requirements
• Be suitable for the transfer of powders and quick-connect/disconnect operations.
• Accommodate connections in the region of:
-100 mm to 50 mm diameter, or
-100 mm to 80 mm diameter to minimise the potential for product blockage.
• Be compatible with hydrofluoric acid (HF Resistant) at concentrations of approximately 25-50% by mass.
• Be suitable for operating temperatures up to approximately 300°C.
• Be suitable for operating pressures from full vacuum to approximately 3 barg.
Additional Information
• An integrated vacuum system for removal of powder from between split butterfly valve faces is not required.
• Alternative materials of construction may be considered such as stainless steel.
• Particular attention should be given to the suitability and chemical resistance of sealing materials for hydrofluoric acid service.
• Sealing materials must be suitable for hydrofluoric acid (HF) at the specified process concentrations.
UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITEDWAC-663258
UKNNL are seeking information from suppliers who may be able to support with an opportunity to consolidate equipment service/repair contracts for our laboratory equipment, based at our Preston Laboratory.
Long term consideration maybe given to extend the contract scope pan-UKNNL for larger scale of savings.
Interested suppliers should contact
[email protected] and [email protected] directly. Supplier can be provided with a full list of assets to be included within the Servicing/Repair Contract.
UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITEDWAC-653602
UKNNL wishes to install a test rig which will consist of a powder feed equipment, a rotary kiln, powder collection, and an off gas scrubber. An associated control system and safety PLC will also be required as part of the procurement. The test rig shall be assembled as a module / skid with ancillary equipment / pipework provided for tie into UKNNL's designated location. UKNNL will undertake vendor engagement & issue a detailed process design pack along with preliminary EC&I documentation & mechanical layouts.
UNITED KINGDOM NATIONAL NUCLEAR LABORATORY LIMITEDWAC-634134