UKFE is seeking to appoint a supplier to provide a Concept Design Study for a Moveable Shielding requirement, as part of the STEP Prototype Power Plant. UKFE is leading the delivery of the STEP programme to design and build the UK’s first prototype fusion energy plant at West Burton, Nottinghamshire.
Please see the Tender Pack, available on the UKFE Delta Portal, for further details on this requirement, the rules of the procurement, and how to bid.
For more information about this opportunity, please visit the eSourcing portal at:
https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Engineering-services./2VD655382C
To respond to this opportunity, please click here:
https://ukfe.delta-esourcing.com/respond/2VD655382C
UKFE is expecting to run a procurement to appoint a supplier to provide Intelligent Client support for assurance and project management activities for Permitting, Licences, Authorisations, Notifications & Consent (PLANC). This will be a critical activity for UKFE as work progresses on the design and construction of the STEP Prototype Powerplant (SPP). Activities will also include supporting integration and interfaces across PLANC, DCO (Development Consent Order) and JOP (Justification of Practice).
The duration of this contract is expected to be 24 months, with an optional 12 month extension.
The procurement is expected to start in August. If the tender is competed via an Open procedure, the launch will be communicated via release of a Tender Notice on the Find-a-Tender (FTS) system and tendering will be undertaken on the UKFE Delta portal.
UKFE is seeking to appoint a suitable Supplier (an individual organisation or a consortium with a lead supplier) for a services contract to provide a study for concept designs of Heating, Ventilation and Air Conditioning (HVAC) within the Tokamak building to be built at West Burton Power Station.
The study shall provide the technical basis for the development of the facility HVAC architecture and ventilation strategy and shall inform the wider Tokamak Building design. The outputs of the study shall support the development of the building layout, contamination control strategy, nuclear ventilation philosophy, and the preparation of a Rough Order of Magnitude (ROM) cost estimate for the HVAC plant and associated systems.
This contract is outcome based with an expected duration of 2 months, with an extension option of up to 2 months incorporated.
For more information about this opportunity, please visit the eSourcing portal at:
https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Feasibility-study%2C-advisory-service%2C-analysis./5ZTKU772XF
To respond to this opportunity, please click here:
https://ukfe.delta-esourcing.com/respond/5ZTKU772XF