STW and HD have a requirement for Fencing Services.
We are keen to engage with interested suppliers in the market who may be able to meet our requirements. Any future Tender Notice will be published and response to this pre market engagement is optional and does not contribute to any procurement process.
We invite suppliers to complete the following form and we will be in touch:
https://forms.office.com/Pages/DesignPageV2.aspx?origin=NeoPortalPage&subpage=design&id=mR5c4eN7XEmXjuynuOqfMZNTc0QN4axFi2iTiwCGSwpURE5MTlVSRVBPNzlQSjRPM1lXQU05WThBUS4u
Framework for the provision of a Tunnelling, Drilling & Shaft Works for Build Only and Design & Build
The Utilities requirement is for the provision of a multi lot Tunnelling, Drilling & Shaft Works Framework for the delivery of works as Build Only and Design & Build across the Utilities regions.
The Lots are detailed below.
B = Build Only, D&B = Design & Build
1 B Pipe Ramming
1 D&B Pipe Ramming
2 B Thrust Boring
2 D&B Thrust Boring
3 B Horizontal Directional Drilling (25-630)
3 D&B Horizontal Directional Drilling (25-630)
4 B Horizontal Directional Drilling (630-1200)
4 D&B Horizontal Directional Drilling (630-1200)
5 B Horizontal Directional Drilling - Rock Drilling (50-500)
5 D&B Horizontal Directional Drilling - Rock Drilling (50-500)
6 B Timber Heading
6 D&B Timber Heading
7 B Micro Tunnelling
7 D&B Micro Tunnelling
8 B Auger Boring
8 D&B Auger Boring
9 B Direct Pipe
9 D&B Direct Pipe
10 B Pipe Jacking
10 D&B Pipe Jacking
11 B Segmental Tunnelling
11 D&B Segmental Tunnelling
12 B Under Pinning (Free Air)
12 D&B Under Pinning (Free Air)
13 B Under Pinning (Compressed Air)
13 D&B Under Pinning (Compressed Air)
14 B Open Caisson Wet
14 D&B Open Caisson Wet
15 B Open Caisson Dry
15 D&B Open Caisson Dry
16 B Sheet Piled Pits
16 D&B Sheet Piled Pits
17 B Timber Shafts
17 D&B Timber Shafts
Interested parties are to note;
- the Utilities requirements will be predominantly Design & Build.
- participants can not bid for a shaft lot in isolation (lots 12-17) they must have drilling/ tunnelling capability.
- during tendering bidders will be evaluated and subsequently awarded Lots where bidders have demonstrated the required competency.
The Utilities intend to call of works via mini competition or direct allocation where direct allocation allows.
Further detail is provided in the PQQ and RFP Briefings and tender documents