Loading page content…
Loading page content…
Loading contract search results…
4 live tenders · Click a result to see its full lifecycle · Updated daily · Contracts Finder + Find a Tender Service
The Museum is undertaking a procurement process to appoint a suitably qualified and experienced Principal Contractor with specialist façade expertise on a Design and Build basis for the design, engineering, procurement, manufacture, installation and completion of the works associated with the upgrade and replacement of the DC1 Glass Solar Wall within the Museum estate. The Contractor shall provide all resources, specialist façade design input, management, supervision and coordination necessary to deliver the works in accordance with the Contract, detailed performance specification and Employer’s Requirements. The Darwin Centre Phase 1 (DC1) is a prominent building in the Museum complex visible from Queens Gate in South Kensington and overlooking the newly created and award winning UNP gardens. The replacement of this façade will enable this section of the site to be returned to operational functionality and integrated back into full use. An investigative study was commissioned by the Museum following the failure of three glass panels on the South Facing ‘Solar Wall’ elevation of the DC1. The solar wall was installed in 2002, and the secondary components within façade systems such as these usually have an expected service life of 25 years if correctly maintained. And NDA will be required before access to the tender documents can be granted. Please ensure NDAs are signed by authorised person in your organisation and returned to the NHM via the Message Centre for counter signature. Access to the tender documents will be granted when both parties have signed the NDA. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Museum-construction-work./WHV9ZF52Y4 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/WHV9ZF52Y4
The Collection Store Refurbishment (CSR) Project forms part of both the wider NHM Unlocked Programme and NHM 150th Anniversary Campaign Programme, which supports: -The internal moves of 11 million specimens -The moves of 28 million specimens to our new facility at Thames Valley Science Park -The 150th Anniversary Campaign to open previously closed galleries to the public -The sale of our South London Collections facility The NHM Unlocked Programme represents the largest ever move of natural history specimens worldwide. The wider CSR project has been tasked with refurbishing collections stores and rehousing five collections across five locations across the South Kensington Estate in suitable collections conditions. The business case for the NHM Unlocked Programme is predicated on limited space and historic, ageing buildings; meaning that globally important specimens are being kept in conditions that hamper access and sometimes fail to meet minimum environmental standards. Moreover, the insights locked up in the collection remain largely untapped. From tackling climate change and meeting the mineral needs of a net zero world, to restoring biodiversity and achieving food security, the collection offers insights into the planetary emergency and how we might realise a brighter future where both people and planet thrive. The CSR Project supports this endeavour. Initially we will be tendering for works on the Osteology Store, this will convert a collections store in the basement of the Grade I Listed Waterhouse Building into a temporary “Logistics Hub” and future end state store for heavy and large specimens coming from our South London Store. As a separate tender there will be a further opportunity to express an interest in tendering for the Main Works package which covers refurbishment works to the other four areas around the South Kensington Estate, including subsequent areas of the Waterhouse Basement (two locations), Darwin Centre Phase 1 and in the Palaeontology Building. This tender relates to the initial works package located in the Osteology Store. The works comprise: -refurbishment and alteration of Rooms B.03, B.07, B.07B-H, B.07J and BC05, -demolition of non-original partitions and raised floors, offices and removal of associated finishes and furnishings (excluding items retained on the eastern wall). -Internal works include the construction of a new security lobby with dry-lined partitions and a powered door, -repairs to damaged fabric and flooring, and measures to prevent pest ingress. -Window and door works including repairs and redecoration to historic partitions and doors, installation of secondary glazing to three north-facing windows, adaptations for building services, and a new powered external door, -Building services works include the removal and rebalancing of existing ventilation systems, strip-out of redundant electrical and data services, and the Stage 4 design and installation of new HVAC, electrical, fire alarm, security, BMS and controls systems. -All works will be undertaken in accordance with the fire strategy, maintaining the integrity of existing 120-minute compartment walls, and will include temporary protection of historic features, cleaning and making good on completion. This phase of the project will initially prioritise the early conversion of the existing basement Osteology Store to a 'Logistics Hub', supporting the sequencing of moves and works in other areas and to reduce programme risk. It is critical that the Logistics Hub is made available early to enable the decant of the Old General Herbarium, the former Origins Gallery, the moves to Thames Valley Science Park (TVSP) and the sale of the South London Collections Facility. Following completion of the decant activities, the Logistics Hub will transition to its permanent configuration and use as a collections store accommodating the Heavy and Large Objects of the Mineralogy and Palaeontology Material Collection. Wherever possible, a 'light-touch' approach has been adopted to support the programme, minimise cost and impact to the significant historic fabric.
£1,000,000
Contract value
In September 2027, we will open a new, permanent gallery at South Kensington dedicated to building a positive connection to nature in our very youngest audiences - aged 4-7 years old - and their adults. This brand-new gallery will be a place where visitors delight in the dazzling variety of life on Earth, from the very small to the very tall, and discover that all life – including us! – share the same needs. We all need to breathe, eat, move, communicate and grow to survive and often depend on each other to do this. Together, we are all part of this great, big, weird and wonderful natural world. It will deliver inspiring stories that celebrate diversity and welcome in the widest possible audience of children and their adults. It will combine our world-leading collections, with hands-on and multi-sensory interactives that evoke joy, empathy and care. This project supports our Strategy and Mission to 2031 and our vision of a future where both people and the planet thrive, with a mission to create advocates for the planet. By appealing to visitors’ sense of kindness, their curiosity, and their imagination, this gallery will lay the foundations of advocacy for nature at a young age, foster a lifelong appreciation of the natural world and build a positive connection to nature in early childhood. Gallery 33 (working title) will replace the current Creepy Crawlies gallery on the ground floor the Grade 1 listed Waterhouse East Building and refurbishing the space for the new exhibition. It will open in September 2027 as a free, permanent gallery, and is expected to welcome millions of visitors over a 25-year lifespan. This is a once-in-a-lifetime opportunity to create a new gallery which positions children at the heart of our Museum and inspire the next generation of children to start their lifelong journey of advocacy for the planet. The Natural History Museum wishes to secure the services of a Principal Contractor to undertake the exhibition fit-out, including sub-contracting the services of an AV Integrator and specialist showcase manufacturer.
£1,400,000
Contract value
This is an exciting opportunity for an AV Hardware Integrator to help us realise our vision for new galleries at the Natural History Museum. We are looking for an experienced AV Hardware Integrator to join our Exhibition Fit Out team to deliver beautiful and inspiring new galleries within our Grade I listed building. We are looking for consultants with experience in AV Hardware Integration, who can work with our Design and Build teams across four major galleries to deliver a robust and consistent AV Hardware approach for our exhibitions, interactives and gallery fit out lighting. All approaches for NHM150 galleries should be grounded in sustainability and accessibility. These galleries form part of Phase 2 of the NHM150 Programme, which focuses on the transformation of the Western Galleries, delivering the base build refurbishment and complete gallery fit-out of four major public galleries. This tender relates to the fit-out only but includes coordination with the base build refurbishment.
£290,000
Contract value
