Loading page content…
Loading page content…
Loading contract search results…
7 live tenders · Click a result to see its full lifecycle · Updated daily · Contracts Finder + Find a Tender Service
Description This Preliminary Market Engagement Notice is published in accordance with the Procurement Act 2023. The Mining Remediation Authority (MRA) is undertaking preliminary market engagement in advance of a future procurement for a replacement Ground Stabilisation Works by Drilling and Grouting Framework. The framework is expected to support ground stabilisation and remediation activities across England, Scotland and Wales, including drilling, pressure grouting, void filling, mine workings stabilisation and associated site investigation works. MRA is seeking feedback from organisations with relevant experience to help inform the procurement strategy, framework structure and commercial arrangements for the future framework. Participation in this engagement is voluntary and will not provide any supplier with an advantage in any future procurement process.
Value undisclosed
This Preliminary Market Engagement Notice is published in accordance with the Procurement Act 2023. The Mining Remediation Authority (MRA) is undertaking preliminary market engagement in advance of a future procurement for a replacement Ground Investigation Framework. The framework is expected to support ground investigation works across England, Scotland and Wales, including site investigations, drilling, sampling, monitoring installations, testing and associated geotechnical and geoenvironmental reporting services. MRA is seeking feedback from organisations with relevant experience to help inform the procurement strategy, framework structure and commercial arrangements for the future framework. Participation in this engagement is voluntary and will not provide any supplier with an advantage in any future procurement process.
Value undisclosed
Visual inspection of 10,000 mine entry locations per year for each year of the contract as supplied by The Mining Remediation Authority Inspectors to record relevant details and complete and upload a digital inspection form for each mine entry they inspect Inspections to be carried out across all areas of the UK Coalfields in England, Scotland and Wales Inspections will be across residential, urban and rural / remote locations
£1,200,000
Contract value
Please note, this Framework was formerly known as Engineering Services. The requirement within the CETPS Framework will support the MRA's functions and may require the following services/deliverables which will be structured into four lots with sub-lots available for consultants that specialise in niche sections of the scope. Mine Water Treatment Schemes and Civil & Structural Engineering - Technical understanding of future mine water treatment schemes (MWTS) design parameters, plus expert structural and civil engineering advice. Ecology and Environmental Services - consultant advice, surveys, appropriate responses to ecological and environmental issues. Treatability - Both passive and active MWTS solution technical design and assessment. Consultancy, Planning and Delivery Oversight - Multi-disciplined Consultants to support for planning advice, site supervision and cost benefit analysis. The delivery of these services directly supports the core purpose of the MRA: to protect and enhance the environment, fulfil organisational commitments, and contribute to creating a better future for communities in former mining areas. This framework plays a critical role in mitigating risks associated with environmental impacts. The estimated framework value is based on forecast demand and represents the maximum anticipated expenditure over the full framework term. It does not constitute a commitment to spend, guarantee any minimum level of work, or guarantee any value of call-off contracts to appointed suppliers. Actual expenditure may vary depending on operational requirements, funding availability and project demand.
£9,400,000
Contract value
The Mining Remediation Authority (MRA) is undertaking this preliminary market engagement to better understand the availability of suppliers capable of delivering field-based High Density Sludge (HDS) pilot treatment trials for zinc bearing mine waters and to inform its procurement approach. In particular, the MRA wishes to understand the extent of supplier capability and capacity within the market for these specialist services. The MRA is seeking to procure a specialist supplier to design, provide, mobilise, operate and report on containerised pilot-scale HDS treatment trials for metal-contaminated mine water at three sites: the former Threlkeld Lead Mines in Westmorland and Furness; Abbey Consols Mine in Ceredigion, Mid Wales; and a site within the Minsterley catchment, Shropshire. The trials are required to validate HDS treatment performance, establish optimised operating conditions and generate robust design, cost and operational data to inform potential full-scale mine water treatment schemes. The requirement is for field-based HDS pilot trials suitable for zinc-rich mine waters with differing water chemistry. The Threlkeld trial will address net-acidic mine water with zinc as the primary contaminant and secondary metals including iron, aluminium, manganese, lead, cadmium, arsenic and nickel. The Abbey Consols trial will address circum-neutral pH mine water with zinc as the primary contaminant and secondary metals including iron, aluminium, manganese, lead, cadmium and nickel. The Minsterley trial will address zinc-rich circum-neutral mine water with lead and cadmium as key secondary contaminants. Flow conditions vary by site and the supplier will be expected to propose and operate an appropriate pilot configuration for each location, including suitable flow management, chemical dosing, monitoring and control arrangements. The supplier will be required to provide and operate containerised HDS pilot plant and equipment capable of demonstrating removal of zinc and relevant secondary metals through appropriate precipitation, sludge recirculation and clarification processes. The trials shall determine optimum treatment conditions, including target operating pH, reagent selection and dosing approach, and may include aeration and/or carbon dioxide stripping capability where appropriate. The scope includes all activities necessary to plan, mobilise, operate, monitor, demobilise and report on the trials. This includes, but is not limited to, pilot plant design and configuration; supply of plant, equipment, chemicals and consumables; mobilisation and set-up; commissioning; operation of the pilot trials; sampling and analysis; process monitoring; solids handling; retention of representative sludge samples; provision of sludge material for WM3 classification and characterisation; data management; interpretation of results; and preparation of final technical reports. The supplier must provide all necessary health, safety and environmental documentation and controls, including method statements, task and site-specific risk assessments, CoSHH assessments, safe systems of work, emergency procedures, PPE requirements and an environmental management plan. Elements of site security (CCTV, fencing) may also be required by the MRA. The trials are expected to be delivered under the Construction (Design and Management) Regulations 2015. The supplier will be required to comply with all applicable UK health, safety and environmental legislation and to work in accordance with the MRA's site access, stakeholder, environmental and operational requirements. Participation requirements are expected to include proven experience delivering HDS trials for metal-contaminated mine water, demonstrated experience in the treatment of zinc-bearing, net-acidic and/or circumneutral mine waters as applicable to the sites, and evidence of operating and optimising field-based pilot HDS trials. Suppliers must be able to demonstrate relevant technical capability, suitable field delivery experience, robust health and safety management, and the ability to produce high-quality trial data and recommendations for full-scale treatment design. The key deliverables will include trial operation records and datasets; detailed testing methodology; performance assessments; optimised operating parameters; sludge characterisation samples and supporting information; and final reports containing conclusions and recommendations for full-scale treatment. The final outputs must provide sufficient evidence to support treatment process validation, full-scale design development, capital and operating cost estimation and future decision-making by the MRA. The estimated value for each trial is expected to be in the range of £150,000 to £200,000 ex VAT. The anticipated duration of each trial is approximately six weeks, requirements currently expected to be delivered by 31 March 2027. The MRA may procure one or more of the site-specific trials under the same opportunity. The MRA may also procure more sites in the future under this notice.
Value undisclosed
The Mining Remediation Authority (MRA) manages the effects of past coal mining, including managing mine water pollution from both coal and metal mines, handling subsidence damage claims which are not the responsibility of licensed coal mine operators, and managing other mining legacy issues. The MRA has a requirement for: Wireline Geologging and other down borehole monitoring & Topographical Surveys including those conducted via Drones. This notice is intended to inform interested parties that the MRA is intending to launch a procurement in January 2027 to find suitably qualified and experienced partners. This notice is not a call for competition and is purely advisory at this time.
£1,500,000
Contract value
The Mining Remediation Authority (MRA) manages the effects of past coal mining, including managing mine water pollution from both coal and metal mines, handling subsidence damage claims which are not the responsibility of licensed coal mine operators, and managing other mining legacy issues. The MRA seek to understand the current capabilities and limitations of, and opportunities presented by, treatment technologies used to remove saline and other mine water contaminants, opportunities for reducing or repurposing wastes, and opportunities for reducing the energy consumption of treatment plant. This will allow MRA to effectively plan future operational work such as purge- and pumping tests where treatment may be required and will potentially be used in the final design of long term MWTS. More information on the scope requirements, procurement strategy and how to register your interest and information on the virtual event will be sent to interested parties on receipt of interest. This notice is issued for information and engagement purposes only and does not constitute a call for competition.
Value undisclosed
