This document is issued as part of the Request for Information (RFI) / Pre-Qualification Questionnaire (PQQ) stage and seeks to obtain information from suitably qualified suppliers for the design, supply, installation, commissioning, and warranty provisions for the Structured Cabling System (SCS), including the following:
▪ OS2 fibre cabling.
▪ Copper Category 6A data cabling.
▪ Coordination of infrastructure services including CCTV cameras and Wi-Fi.
▪ Duct cover lifting, draining of flooded ducts and other civil works as identified and required.
▪ Scaffolding to protect/safeguard the exposed civil ducts.
▪ Professional services and preliminaries.
The overall infrastructure implementation design for Berth 5 will primarily consist of diverse redundancy fibre connectivity, ensuring full connectivity to both onsite data centres.
The data centres are located at:
▪ DC West is located at No. 1 London Gateway.
▪ DC East is located at the Terminal Building.