Purpose of Notice -
The procurement of a Subcontractor for the temporary traffic management in connection with the A417 Missing Link at Air Balloon.
Scheme Description -
Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon.
The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley.
Registering Interest -
Interested parties are to register their interest through making contact via guy.hornsey@kier.co.uk.
A417 Missing Link - Structures Formwork, Reinforcement & Concrete
Purpose of Notice -
The procurement of a Subcontractor for the structures formwork, reinforcement and concrete works in connection with the A417 Missing Link at Air Balloon.
Scheme Description -
Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon.
The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley.
Registering Interest -
Interested parties are to register their interest through making contact via guy.hornsey@kier.co.uk.
Purpose of Notice -
The procurement of a Subcontractor for the Series 600 Earthworks works in connection with the A417 Missing Link at Air Balloon.
Scheme Description -
Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon.
The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley.
Registering Interest -
Interested parties are to register their interest through making contact via guy.hornsey@kier.co.uk.
Purpose of Notice -
The procurement of a Subcontractor for the Series 500 Drainage works in connection with the A417 Missing Link at Air Balloon.
Scheme Description -
Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon.
The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley.
Registering Interest -
Interested parties are to register their interest through making contact via guy.hornsey@kier.co.uk.
Purpose of Notice -
The procurement of a Subcontractor for the Series 700 Pavement works in connection with the A417 Missing Link at Air Balloon.
Scheme Description -
Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon.
The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley.
Registering Interest -
Interested parties are to register their interest through making contact via guy.hornsey@kier.co.uk.
Manchester International Airport Platform Remodelling 2nd FBC - Signalling and Telecoms
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions."
Manchester International Airport Platform Remodelling 2nd FBC - OLE Works
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions."
Manchester International Airport Platform Remodelling 2nd FBC - Permanent Way
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions."
Manchester International Airport Platform Remodelling 2nd FBC - Bored Piling (SFA, Rotary Bored)
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport.
The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP):
A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services.
The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions.
Kier Transportation are looking to engage experienced and qualified contractors to carry out works pertaining to the Structural Steel on the A66 Northern Trans-Pennine scheme. The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
A66 Northern Trans-Pennine Project (NTP) - Schemes 1,2 and 6 Piling works
Kier Transportation are looking to engage experienced and qualified contractors to carry out works pertaining to the Piling works on the A66 Northern Trans-Pennine scheme. The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Kier Transportation are looking to engage experienced and qualified contractors to carry out works pertaining to the Structural Steel at M6 Lune Gorge.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
A66 Northern Trans-Pennine Project (NTP) - Schemes 1, 2 and 6 Supply of Labour for Main Works
Kier Transportation are looking to engage experienced and qualified Suppliers for the Provision of Labour Supply on the A66 Northern Trans-Pennine scheme.
The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
A66 Northern Trans-Pennine (NTP) - Schemes 1, 2 and 6 Self Drive and Operated Plant
Kier Transportation are looking to engage experienced and qualified contractors to carry out works pertaining to the provision of Self Drive and Operated Plant for the main works on the A66 Northern Trans-Pennine scheme.
The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
A66 Northern Trans-Pennine (NTP)-Schemes 1, 2 and 6 Precast Concrete
Kier Transportation are looking to engage experienced and qualified contractors to carry out works pertaining to the Precast Concrete works on the A66 Northern Trans-Pennine scheme. The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
M6 Lune Gorge - Demolition of Existing Motorway Bridges
Kier Transportation require a Subcontractor to undertake Demolition works across 7 bridges (14 structures) on the M6 Lune Gorge Junction 37 to 38.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
M6 Lune Gorge - Formwork Reinforcement & Concrete Works
Kier Transportation require a Subcontractor to undertake Formwork, Reinforcement and Concrete across 7 bridges on the M6.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email Transportationprocurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.