University Hospitals of Northamptonshire (“UHN”) wishes to commission full consultant led ENT services to ensure supply meets demand of our local population and that service users are offered free choice of provider that most suits their individual needs at the point of referral.
1.2 The Provider shall deliver a full Consultant-led ENT RTT Pathways service on behalf of UHN with patients being transferred to the provider via the IPT process, encompassing referral management, diagnostics, outpatients’ activity, elective and day case procedures, post operative follow up, discharge and RTT administration and clock management. The provider shall deliver UHN expectations of a high quality, integrated, safe and patient centred pathway.
The service is commissioned to improve access, eliminate long RTT waits and provide a resilient elective capacity whilst maintaining safety, quality and patient experience in line with NHS and GIRFT guidance.
The Provider will be fully accountable for RTT performance for all patients transferred or referred under this contract.
The service is commissioned by both Kettering General Hospital NHS Foundation Trust (“KGH”) and Northampton General Hospital NHS Trust (“NGH”) under the banner of UHN and is accountable and responsible to the Chief Operating Officer of UHN via the respective Head of Operations or their nominated deputy.
Kettering General Hospital NHS Foundation TrustWAC-647619
UHN - Provision of Refurbishment Works to Upgrade an Existing Data Centre
University Hospitals of Northamptonshire (UHN), which consists of Kettering General Hospital NHS Foundation Trust (KGH) and Northampton General Hospital (NGH), are seeking to engage the market in advance of a forthcoming tender opportunity for the provision of refurbishment works to upgrade an existing data centre.
It is intended that the procurement will cover the design, supply and delivery of refurbishment works to upgrade its secondary data centre known as DC2/P55 at Kettering General Hospital.
The purpose of this early market engagement is to gather insights from potential suppliers to help inform the scope, structure, and approach of the procurement to ensure it meets the needs of the organisation and delivers best value.
To obtain the required level of resilience the DC2/ P55 data centre needs to be brought up to an IT Industry standard Tier 2 data centre. This is to be achieved by addressing the mechanical and engineering infrastructure which provide services to the data centre combined with a review of the overall design / layout of the room and provision of new, standardised racks, cable containment, etc. This is intended to reduce the risk of future outages, ensure the room is running efficiently, has some spare capacity (space, power, cooling, etc.) for future expansion and is able to run as a single entity during the migration of IT equipment / Infrastructure out of the current primary data centre DC1.
Indicative timelines for this project are:
Site Visit: Upon Request during Aug 26
Tender Issue: Sep 26
Project commencement: Oct ‘26
Project completion: Sep ‘27