NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.
We are seeking a specialist subcontractor to undertake the following works within the NC2A section:
The Subcontractor shall provide all necessary management, supervision, plant, labour, materials and temporary works to deliver the blockwork package for Wendover Green Tunnel Portal Buildings. The works comprise the construction of external masonry walls and internal masonry partition walls, including the supply and installation of the following, but not limited to:
•Concrete blockwork on the external perimeter walls to be on a 150mm x 140mm concrete upstand
• Internal partition walls are to be founded directly on the structural foundation slab.
• Sand and cement skirting
•440x215x140mm 7.3N/mm2 1450kg/m3 concrete blockwork, including all associated connections and movement joints
•Stainless steel bed joint reinforcement and all masonry ties
•Padstones
•Concrete lintels
•Wall head fire stopping system
Please carefully consider the information above and whether this opportunity is suitable for your business before registering your interest.
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
EKFB are looking for a Subcontractor for the design, supply, installation, management and completion of the Claydon Road Overbridge Access Stairs and Hard Slope (hard landscaping) trial works, including all labour, plant, equipment, materials, temporary works, supervision and quality documentation required to deliver the works.
Works to include the following elements
Review of the proposed product requirements and recommendation of suitable alternatives where applicable.
Preparation and submission of shop drawings for acceptance.
Supply and installation of:
GRP stair panels
Posts
Hollow blocks
Fixings and consumables
Paving slabs
Edging kerbs
Associated stair and hard slope components
Installation of aggregate and topsoil in accordance with permanent works specifications.
Identification of any exclusions necessary to complete the works.
Trial Works will then inform the methodology on how we proceed going forward with further structures within the G2S section of the works, if successful leading to future works. G2S have approximately 29 sets of Access Stairs of various lengths to be supplied and / or installed.