Roofing replacement to 3 residential blocks at Clent Way, Birmingham, including asbestos removal, where damage has been identified. Bats are nesting in parts of the roof, some timescales are tight.
To provide internal decoration & flooring to flats, houses and bungalows that are being used for decant purposes or require works for property sale. To include paint work to all walls, ceilings and woodwork, and carpet, vinyl and laminate as required to all rooms across all GSA localities.
GSA's objective is to procure a Health and Safety Management System that provides accessible functionality for both desk‑based and peripatetic colleagues across its geographical portfolio. The system must support comprehensive reporting capabilities, along with controlled visibility through configurable user permissions to ensure the protection of personal and sensitive data.
All events and records should be accessible via a secure, 24/7 electronic platform, enabling consistent access for a wide range of operational teams.
GSA is seeking a sustainable, organisation‑wide solution that supports the effective management of health and safety activities and enables streamlined processes across the business.
GreenSquareAccord is looking to tender for the Supply of Materials for our in-house DLO team and wider Departments including:
- Managed Store Access Solution:
- Delivery and Counter Service (including enhanced delivery options and out of hours supply)
- Stock holding, Stock Availability, Substitutions and Special Items;
- Price Management, Quarterly Price Files and Support Terms:
- Van Stock Management;
- Innovative Solutions;
- Sustainability, Ethical Sourcing and Waste:
- IT app and Invoicing Solutions;
- Shared Office Space hot desking facilities;
- Hire Equipment;
- Waste Storage.
GreenSquareAccord's Microsoft Enterprise Agreement (EA), underpins the delivery of core technology services across the organisation. The agreement will provide licensing for key Microsoft technologies that support both corporate functions and front line service delivery, including:
• Microsoft 365 services (e.g. email, collaboration, and document management)
• Windows Enterprise licensing
• Security and identity services, including Microsoft Entra ID and endpoint security
• Azure cloud services, where required to support infrastructure and application hosting
The scope of the agreement includes:
• Provision of user based and device based licensing to support all employees and relevant third parties
• Flexibility to accommodate organisational changes through annual true up arrangements
• Access to Software Assurance benefits, including upgrades and enhancements
• Enablement of secure, modern ways of working, including remote and mobile access for staff delivering tenant facing services
• Ongoing compliance with data protection, cybersecurity, and regulatory requirements
The intended outcome of this procurement is to ensure that the organisation maintains a secure, compliant, and scalable technology platform that supports both day to day operations and ongoing digital transformation.
Electrical Fire Safety, General Testing and Repairs
To complete electrical works that arise from Fire Risk Assessments across all GSA Localities alongside general electrical testing and repairs for the inhouse team.
To supply Group-wide waste services including a Client Portal allowing waste management reporting, booking, programming, transfer notes, invoice and billing, and spend analysis. It covers all waste types.
Asbestos non-licensed & licensed removals, including small reinstatement works consisting of plasterboard ceilings, vinyl flooring, corrugated shed roofs, small roofing works across all GSA localities
o identify, analise and carry out rectification damp and mould related solutions across a GSA group wide portfolio of 24000 properties. Scope of works will focus on surveying the cause, signs and treatment of the following topics:
Rising Damp.
Penetrating Damp.
Condensation Control and Treatments.
Data Logging and Reporting.
Mechanical Ventilation / PIV's & MHVR's
Passive Ventilation.
Chemical Damp.
Penetrating Leaks and Water Ingress or Leaks from Poor Plumbing.
Damp and Mould resulting from Drying Materials.
Removal and Replacement of Cavity Wall Insulation
Removal and Replacement of loft insulation
Surveys and reports for damp and CWI
Management Surveys in non-domestic and domestic properties.
• Re-inspection Surveys in non-domestic properties (annual).
• Management Survey with targeted areas for major/capital works.
• Refurbishment and Demolition Survey.
• Re-inspection survey in domestic properties (based upon risk).
• Bulk Sample Analysis of potential Asbestos Containing Materials, and air testing
• Air Monitoring and Analytical Works including Four Stage Clearance, Reassurance, Personal, Background.