This contract is to fulfil general forest road/ride vegetation maintenance within the South District for Forestry England’s road and ride network. The contract is split into 7 Lots, due to the extent of the geographic area. The contractor can bid on an individual Lot or a group of Lots. If bidding on a group of Lots, the contractor will need to demonstrate capacity to deliver all works required within the selected Lots in the indicative time frame. Only one contractor will be assigned to each Lot.
Forestry England (for and on behalf of the Forestry Commission)30 Apr 2026WAC-583075