Cambridge City Council is seeking to procure the services of a consultant to initially meet with and subsequently assist two local not-for-profit landlords in applying for registration as a not-for-profit registered provider with the Regulator of Social Housing.
Cambridge City Council invites contractors to bid for the repair of the riverside wall at Jesus Green:
The Works will comprise the following:
• Full design for the Works.
• Stabilisation and repair of the existing Riverside Wall.
• Construction of a new sheet pile wall with associated infill and capping.
• Tie-in and local modification of the existing wall and footpath structure.
• Modification and reinstatement of existing outfalls, pump-out and drainage arrangements.
• Replacement of the foul-water drainage serving Jesus Green Lido.
• Protection and coordination of existing utilities and services.
• Temporary footpath diversion, site fencing and public access management.
• River-based access, material delivery and temporary storage arrangements.
• Temporary works and construction access required to complete the wall stabilisation.
• Reinstatement of affected footpaths, paving, grassed areas and riverbank surfaces.
Civic Quarter Project - Removals and Storage Services
The Civic Quarter Project includes the refurbishment of two significant Council assets, the Guildhall and the Corn Exchange.
To facilitate the refurbishment works from January, the Council requires a comprehensive removals, transportation, storage and reinstatement service covering a wide range of assets including heritage items, artwork, antiques, furniture and technical equipment. The decant activity needs to take place from mid-November for Guildhall and January for the Corn Exchange.
MARKET ENGAGEMENT EVENT for Multiple Responsive Repairs Contracts
The Council has an ongoing 'Business as Usual' need to provide responsive repairs to its housing and commercial estate in support of the DLO and Property Services.
This is a relaunch of the project first advertised in September 2025
The Council will still be letting a long-term contract divided into two 2 separate Lots. The duration is expected to be between five (5) and up to eight (8) years. It is currently anticipated there will be one main contract for each of the two lots. The specification for both Lots are the same, they are differentiated geographically. These contracts are complex in nature and this will be fully explained in the tender documents.
The main element of work will be responsive requirements, and this means there will be no opportunity to batch work. Some of the work will be mechanical and electrical repairs, minor alterations and structural improvement works that may require planning and are of a small project in nature.
Work will be allocated on an as it arrives basis and will carry various levels of urgency which will require significant demonstration of the ability to manage a contract of this kind and volume.
Both Lots will be General Building Contracts - covering responsive repairs across a number of general and specialist requirements, reactive maintenance including, but not limited to glazing, roofing repairs, brickwork and masonry work plastering, fencing, gates and scaffolding and general rubbish / garden clearance and removal of small sheds/lean-to's and similar temporary buildings. In addition, there may be a level of supplementary support required, during busy periods, for the in-house Direct Labour Organisation (DLO). This will be on an as required basis and may include painting and decorating, repairs to kitchens and bathrooms, plumbing, carpentry and electrical.
Furthermore, there will be additional commercial properties as well as Council run facilities, such as Community Centres on a responsive included on an as required basis.
There will be a requirement for service provision for both out-of-hours and emergency call-outs. This will be another of the workstreams in both Lot1 and Lot2 of this contract.
Another of the workstreams (in both Lots) will be Void Property works this covers the refurbishment of any vacated Council owned housing in support of the DLO on an as required basis covering the requirements above and readying the property to be let to new tenants. It will also cover, commercial properties to a lesser extent.
Small alterations and structural works such as wall reinforcement and underpinning projects may also be included as a workstream.
Lots One and Two will be treated as separate and distinct contracts. It is the councils intent to award two separate contractors - one for each lot. The geographical split of the two main contracts will be approximately equal in the numbers of properties and there is an expectation that this will be a three way partnership with both contractors and the Council delivering an increasingly efficient service to the residents of Cambridge City.
The overall value of these contracts is currently estimated as approximately £32.0m for both contracts. The timetables for the letting of all of these contracts is extremely tight and they must all be let, awarded and mobilised no later than end of April 2027.
We are excited to continue on the procurement of this challenging process and aim to release full tenders by no later than end-October 2026 with Contract awards by mid-January 2027 giving approximately six weeks to mobilise and be ready for work to be allocated by mid- April 2027.