| Source: | Contracts Finder |
| Notice Type: | Tender amendment |
| Buyer: | THE PIRBRIGHT INSTITUTE |
| Main Category: | Services |
| Procurement Method: | Open procedure (below threshold) |
| Tender Status: | Closed |
| Estimated Value (ex. VAT): |
Awarded to
| Award value: | £133,840 |
| Award decision date: | 27 June 2024 |
| Award status: | Active |
The contract is for a single supplier to provide Project Management and Detailed Design in relation to the CHP LTHW Heat Recovery Project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. PROJECT SCOPE AND OBJECTIVES The primary objective of the project is to realise Greater financial sustainability through the utilisation of free waste heat available from CHP via LTHW and through system rationalisation and utilisation. This will also realise reduced carbon emissions of circa 12%. The following Work packages are included with scope of Project Management: Work Package 2: CHP LTHW Mechanical and controls design Work Package 3: LTHW Connection to Plowright All information and details of how to apply are included in the ITT package and associated Appendices uploaded into 5. Attachments
Document pack· 15 files
Published contracts in the last 12 months
76
total contracts
£4.6m
total value
£171,127
average contract size
Typical categories
Site Steam Management and Boiler Maintenance
THE PIRBRIGHT INSTITUTE · WAC-641586
ISO11 Fumigation Lobby Replacement Project - Civil Works and CDM Principal Designer/Principal Contractor Role
THE PIRBRIGHT INSTITUTE · WAC-640378
ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU)
THE PIRBRIGHT INSTITUTE · WAC-640379
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
24 May 2024
Closed
Estimated Value
£123,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| £123,000 |
| Release Date: | 7 May 2024 |
| Application Deadline: | 24 May 2024 |
| Contract Start Date: | 30 June 2024 |
| Contract End Date: | 31 October 2025 |
| Contract Duration: | 1.3 years |
| Procurement ID (OCID): | ocds-b5fd17-b9990e69-6c8b-411c-83af-d59cf1c85aec |
| Notice Reference: | ea78a8bb-7b86-4e93-9042-22cb66f55b00-748707 |
All 3 notices for this procurement, oldest first.
ISO 11 CHP LTHW Heat Recovery (Project Management and Detailed Design)
ISO 11 CHP LTHW Heat Recovery (Project Management and Detailed Design)
ISO 11 CHP LTHW Heat Recovery (Project Management and Detailed Design)