Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | United Utilities |
| Main Category: | Goods |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: |
| Pre-tender |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 24 November 2026 |
| Application Deadline: | 30 April 2027 |
| Enquiry Deadline: | 11 December 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-07c256 |
| Notice Reference: | 111097-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
| Call-off method: | Both: direct call-off and mini-competition |
United Utilities require the supply of metallic valves and ancillary equipment including the design, manufacture, delivery to and off-loading at site, provision of drawings, operation and maintenance manuals, technical data sheets and factory test certification for all items included. The scope of supply includes but is not limited to the following; Gate valves Butterfly valves Non return valves Air / gas release valves Plug valves Fire hydrants Penstocks In line check valves (used on combined sewer overflow outfalls for example) Valve and hydrant accessories. All valves shall comply with WIMES 8.09 Valves Issue 2 and the relevant clauses of Standard Specification S03 – Mechanical Engineering Issue 16, amended and/or clarified by the additional clauses detailed below. Valve variants shall be available for drinking water and non-drinking water applications and shall cover both treatment and network installations. Valves shall be suitable for the working pressure of the pipe for which they are intended and shall also be capable of withstanding a negative pressure of 0.8 bar below atmospheric pressure at temperatures up to 20 degrees centigrade. All penstocks shall comply with the relevant clauses of WIMES 8.10 Penstocks, Stopgates, Stoplogs and Handstops Issue 2. The company also requires; The Supplier shall be able to provide all the ancillary components necessary to complete a specific installation. These shall typically include coping brackets, operating pillars and handwheels, chain operated handwheels, gearboxes, extended spindles with spindle guide brackets, spindle protection tubes, obturator position indicators, underground installation sets with protection tubes and surface boxes. . Coping brackets, operating pillars, guide brackets and protection tubes shall be manufactured in cast iron, SG Iron or fabricated carbon steel. Extended spindles and muff couplings shall be manufactured in stainless steel or suitably protected carbon steel. Surface boxes shall be manufactured in cast iron or SG iron. When required, a close coupled top flange shall be provided to allow direct mounting of a gearbox or actuator. A keyed fixing shall be used to connect the spindle to the drive and the valve spindle shall be fully enclosed when the input device is mounted. When an actuated valve is required, the Supplier shall liaise with the Kit Framework Suppliers for Electric Actuators. The Supplier shall be responsible for ensuring that the correct actuator for the duty is provided. Actuators shall be fitted at the valve suppliers works and the assembly tested to ensure correct interfacing and operation before delivery to site. Where appropriate, the actuator and valve components shall be match-marked and labelled to ensure correct re-assembly on site. The Valve Supplier shall provide all the fixings and fittings required to enable the actuator to be fitted.
The supply of Gate valves
Contract period: 31 July 2027 → 1 August 2030
The supply of Butterfly valves
Contract period: 31 July 2027 → 1 August 2030
The supply of Non return valves
Contract period: 31 July 2027 → 1 August 2030
The supply of Air / gas release valves
Contract period: 31 July 2027 → 1 August 2030
The supply of Plug valves
Contract period: 31 July 2027 → 1 August 2030
The supply of Fire hydrants
Contract period: 31 July 2027 → 1 August 2030
The supply of Penstocks
Contract period: 31 July 2027 → 1 August 2030
The supply of In line check valves (used on combined sewer overflow outfalls for example)
Contract period: 31 July 2027 → 1 August 2030
The supply of Valve and hydrant accessories
Contract period: 31 July 2027 → 1 August 2030
Published contracts in the last 12 months
7
total contracts
£98.0m
total value
£19,600,000
average contract size
Typical categories
Framework Agreement for the Supply and Delivery of Bulk Fuels and Associated Services
United Utilities · WAC-717194
Framework Agreement for the Supply and Delivery of Bulk Fuels and Associated Services
United Utilities · WAC-717196
Framework Agreement for the Supply and Delivery of Bulk Fuels and Associated Services
United Utilities · WAC-705046
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
30 April 2027
157 days left
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →