Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Northern Lighthouse Board |
| Main Category: | Works |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | £1,800,000 |
| Estimated Value (inc. VAT): | £2,160,000 |
| Release Date: | 23 November 2026 |
| Application Deadline: | — |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
The NLB are seeking to appoint a Principal Contactor to plan and manage the full refurbishment of Skerryvore Lighthouse, the works are expected to take around 4 years working in the summer months only, with the contractors living in a camp based on Hynish, Tiree. The works will be in 5 distinct phases. Camp Set Up The Principal Contractor will be required to set up a semi-permanent site camp, with designated site office, welfare facilities and lie in accommodation for the duration of the project. Strip-Out. The eleven-storey granite tower is to be completely stripped out back to bare stone. This will include the removal of existing steel fuel tanks, water tanks, all partitions, diesel generators and all fixtures and fittings. The internal walls of the tower have previously been sprayed with Gunite, and asbestos containing material, as part of the initial strip out a registered asbestos removal company will require to be sub-contracted to removal all remaining traces of the Gunite on each floor. Solar Installation. The new Optic for Skerryvore it to be solar powered. To do this a cantilevered aluminium platform will be erected from the lighthouse balcony, this will support at 24 panel solar array, also constructed from aluminium. The solar gain will charge a battery bank housed in one of the 11 levels which will in turn run the optic. At this stage a new aluminium access platform will also be installed at the entrance level. Domestic Installation Stage three will be the domestic installation for both power and water supply/drainage. Power will be generated through a small generator and supplemented by any surplus solar power. New fuel tanks and supply lines will be installed. The water supply will be using an unvented cylinder, storage tanks and a house pump. Fit out and Decoration The final stage of the project will be the establishment of welfare, bedrooms, kitchen and decoration internally where required and externally at the lightroom.
Published contracts in the last 12 months
88
total contracts
£78.6m
total value
£1,482,497
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£1,800,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Contract Start Date: |
| 24 August 2027 (Estimated) |
| Contract End Date: | 4 November 2031 (Estimated) |
| Contract Duration: | 4.3 years |
| Procurement ID (OCID): | ocds-h6vhtk-07c196 |
| Notice Reference: | 110711-2026 |