Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | SEVERN TRENT WATER LIMITED |
| Main Category: | Services |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: |
| Open |
| Estimated Value (ex. VAT): | £8,000,000 |
| Estimated Value (inc. VAT): | £8,000,000 |
| Release Date: | 23 November 2026 |
| Application Deadline: | 18 January 2027 |
| Procurement ID (OCID): | ocds-h6vhtk-06df4a |
| Notice Reference: | 110724-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | Both: direct call-off and mini-competition |
The framework is divided into two lots: Lot 1 - Blower and Compressor Servicing and Maintenance and Lot 2 - Aeration Systems Performance Evaluation and Improvement. Suppliers will be required to deliver services that improve asset reliability, operational performance, energy efficiency, and whole-life value across activated sludge process (ASP) systems. Lot 1 covers the planned preventative maintenance, condition monitoring, repair, overhaul, breakdown response, and lifecycle management of air blowers, air compressors, gas blowers, and gas compressors, including associated control and instrumentation equipment. Lot 2 focuses on identifying and delivering energy and process efficiency improvements through blower performance testing, aeration system assessments, ASP process optimisation, diffuser performance evaluation and acid cleaning, whole-life cost analysis, and support for capital improvement projects. Suppliers may also be required to provide independent technical advice, project management, and Principal Contractor or Principal Designer services under CDM 2015. The framework aims to support reduced energy consumption, improved process performance, enhanced asset lifespan, and continuous improvement across the Utilities' wastewater treatment operations. Suppliers will be expected to operate to defined performance standards, provide regular management information, and proactively identify innovation and efficiency opportunities throughout the contract term
Lot 1 covers the planned preventative maintenance, condition monitoring, repair, overhaul, breakdown response, and lifecycle management of air blowers, air compressors, gas blowers, and gas compressors, including associated control and instrumentation equipment
Lot 2 focuses on identifying and delivering energy and process efficiency improvements through blower performance testing, aeration system assessments, ASP process optimisation, diffuser performance evaluation and acid cleaning, whole-life cost analysis, and support for capital improvement projects.
Document pack· 1 file
Published contracts in the last 12 months
129
total contracts
£4013.1m
total value
£83,605,708
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
18 January 2027
57 days left
Estimated Value
£8,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →