Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Contracts Finder |
| Notice Type: | Tender notice |
| Buyer: | Kier Transportation - CP7 NWC |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: |
| Open |
| Estimated Value (ex. VAT): | £1,000,000 |
| Release Date: | 23 November 2026 |
| Application Deadline: | 4 December 2026 |
| Contract Start Date: | 26 July 2027 (Estimated) |
| Contract End Date: | 27 September 2027 (Estimated) |
| Contract Duration: | 2 months |
| Procurement ID (OCID): | ocds-b5fd17-7a56a3ef-837e-44f8-8e43-40be3e4ea4b9 |
| Notice Reference: | 0211da5c-4889-4c4f-98f6-00dc7cc1b7c8-922293 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the platform civils work at Manchester Airport Station. • Platform demolition • Asset recoveries • Track walkway/crossings • UTX • Troughing • Riser wall foundations • New riser walls (blockwork and PCC) • Copers (including realignment) • Tactile paving • Drainage (ACO's and carrier) • Ducting • Equipment foundations (in-situ and PCC) • Waiting shelter foundations • Platform furniture • SME works (end of platform ramps) • Fencing/Gate works • Block paving/surfacing • Associated reinstatement works
Document pack· 1 file
Published contracts in the last 12 months
12
total contracts
£11.4m
total value
£954,167
average contract size
Typical categories
Manchester International Airport Phase 2 - Overbridge Civils
Kier Transportation - CP7 NWC · WAC-678447
Manchester International Airport - Rail Footprint Civils
Kier Transportation - CP7 NWC · WAC-666599
Manchester International Airport - Shotcrete works
Kier Transportation - CP7 NWC · WAC-661110
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
4 December 2026
12 days left
Estimated Value
£1,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →