Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Buckinghamshire Council |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: |
| Open |
| Estimated Value (ex. VAT): | £126,030,000 |
| Estimated Value (inc. VAT): | £151,236,000 |
| Release Date: | 21 November 2026 |
| Application Deadline: | 23 December 2026 |
| Enquiry Deadline: | 15 December 2026 |
| Contract Start Date: | 31 March 2027 (Estimated) |
| Contract End Date: | 31 March 2030 (Estimated) |
| Contract Duration: | 3.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-06cc4e |
| Notice Reference: | 110379-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | With mini-competition (call-off via competition) |
The provision of highway related construction works and associated services comprising capital-funded maintenance and improvement schemes, delivered in accordance with Buckinghamshire Council's asset management strategy to enhance the operation and maintain the serviceability of the highway asset and include, without limitation: This Procurement is being conducted to establish an Open Framework Scheme in accordance with Section 49 of the Procurement Act 2023. The maximum total duration of this Open Framework Scheme—including all successive framework agreements awarded under it—shall be eight (8) years from the commencement date of the initial framework agreement. The Framework is divided into seven (7) discrete Lots. It is the Contracting Authority’s intention to appoint a maximum of four (4) suppliers to each individual Lot at any given time.
• Civil engineering works • Electrical works, including those associated with pedestrian crossings (e.g. signals, lighting columns, and Belisha beacons) • Safety Fencing • Traffic Signal modifications • Lighting schemes • Footway maintenance and improvement schemes
• Road markings • Road studs • Pre surveys/design • Traffic signs
• Soakaway / borehole installers • Drainage improvement Schemes • Greening and drainage works, including Sustainable Drainage Systems (SuDS)
The provision of structural maintenance and improvement works
• Carriageway inlay • Carriageway overlay • Carriageway reconstruction • Carriageway strengthening /reinforcement • Prep Work for Surface Treatments
• Micro surfacing • Thin surfacing systems • Surface dressing • High friction surfacing • Joint repair and reinstatement • Coloured and decorative surfacing • Retexturing • Slurry Sealing on footways
• Grouted macadam and the like • In situ recycling • In situ recycling (cold or hot) • Full depth reclamation (FDR) • Pulverisation and stabilisation
Document pack· 2 files
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
23 December 2026
32 days left
Estimated Value
£126,030,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →