Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Planning update |
| Buyer: | National Highways Limited |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
3 December 2026
14 days left
Estimated Value
£16,666,666.67
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £16,666,666.67 |
| Estimated Value (inc. VAT): | £20,000,000 |
| Release Date: | 20 November 2026 |
| Application Deadline: | 3 December 2026 |
| Contract Start Date: | 31 March 2027 (Estimated) |
| Contract End Date: | 31 March 2032 (Estimated) |
| Contract Duration: | 5.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-069a5f |
| Notice Reference: | 110335-2026 |
All 4 notices for this procurement, oldest first.
LTC - Specialist Professional and Technical Services Framework
Lower Thames Crossing (LTC) - Specialist Technical and Professional Services Framework (STaPS)
Lower Thames Crossing (LTC) - Specialist Technical and Professional Services Framework (STaPS)
Lower Thames Crossing (LTC) - Technical Services
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Following careful consideration of the feedback received from the market, National Highways has undertaken a review of the proposed procurement strategy for the Technical Services requirement. As a result of this review, National Highways has decided not to proceed with the previously proposed multi-supplier framework arrangement. Instead, the requirement will be procured as a single-lot agreement with a sole supplier. This change is intended to ensure the procurement approach best supports the project's objectives and delivers the most effective outcome for all parties. To provide the market with a further update and an opportunity to engage on the revised proposal, National Highways will be updating the UK2 notice and holding an additional Market Engagement Session on 26 November 2026 at 10:0am via Microsoft Teams.
Previously - Lower Thames Crossing (LTC) - Specilaist Technical and Professional Services Framework (STaPS) The core principles and key objectives are • Until the Lower Thames Crossing is a private company the Consultant is to provide technical support for all technical submissions with formal acceptance and sign off with SES. • After the Lower Thames Crossing is a private company the Consultant is to carry out the role of a technical approval authority and provide technical acceptance / approval for all technical submissions. • When the Lower Thames Crossing is a private company the Consultant will continue to engage with the different directorates of National Highways if there are any works which have an impact on the Strategic Road Network and fulfil any requirement deemed necessary by National Highways. As a directorate and programme within National Highways the Lower Thames Crossing falls in the technical guidance provided by the Safety Engineering and Standards directorate. The Lower Thames Crossing is transitioning to become a privately owned company and will be independent of National Highways by 2028. The programme will have to ensure that an equivalent service and governance as that currently provided by the Safety Engineering and Standards directorate are in place at this time to support the new company and delivery of the capital programme. The Lower Thames Crossing has been designed in accordance with the Design Manual for Roads and Bridges standards. The purpose of the contract is for the Consultant to provide road transport related technical consultancy, engineering and assurance advice to the Client, as required, on the following: Structures Road Alignment Design Geotechnical Tunnnels Pavements Road Restraint Systems Drainage Lighting Roadside Technology Road Signs and Markings Soft Estate Knowledge Sharing: To support knowledge sharing, the Consultant is required to identify opportunities to share knowledge with objectives of • upskilling the Consultant’s and Client’s staff across the contract, • ensuring the most effective and cost appropriate staff in the consultancy are able to do the work and are trained, • achieve best value for the Client and help support the objectives of the contract.
Published contracts in the last 12 months
1,215
total contracts
£22136.5m
total value
£27,362,767
average contract size
Typical categories
Replacement of Social Enterprise Dynamic Purchasing System (SEDPS)
National Highways Limited · WAC-710146
National Highways - Cost Estimating Framework (2028-2032)
National Highways Limited · WAC-703522
National Highways - Cost Estimating Framework (2028-2032)
National Highways Limited · WAC-703534