| Source: | Find a Tender Service (FTS) |
| Notice Type: | Planning update |
| Buyer: | Defence Equipment and Support |
| Main Category: | Goods |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£315,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £315,000,000 |
| Estimated Value (inc. VAT): | £378,000,000 |
| Release Date: | 20 November 2026 |
| Application Deadline: | — |
| Contract Start Date: | 30 June 2027 (Estimated) |
| Contract End Date: | 1 July 2039 (Estimated) |
| Contract Duration: | 12.2 years |
| Procurement ID (OCID): | ocds-h6vhtk-04fd69 |
| Notice Reference: | 110348-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
This Notice has been amended to include an update on upcoming Materiel Distribution Land (MDL) Programme Market Interest Day planned for 14 January 2027 and link to PME Notice 2026/S 000-110321.
The Ministry of Defence (the Authority) under the Materiel Distribution Land (MDL) programme is developing a requirement project for Heavy Equipment Transporter (HET) platform. Initially circa 70 to 90 vehicles with an integrated support solution service for an initial period of ten years, with potential options to increase the acquisition volume and extend beyond the initial support period. Aspirational Full Operating Capability (FOC) is June 2029. This requirement aims to introduce a new, technologically advanced system for the delivery of heavy and out-of-gauge equipment, with a minimum threshold of eighty-five (85) metric tonnes, featuring improved low mobility lift capabilities. This system will significantly improve and sustain the operational movement of heavy, mission-critical equipment well into the future. The primary role is to transport heavy armoured equipment, including armoured fighting vehicles (AFVs) and main battle tank (MBT), but it must also be capable of moving lighter equipment into the theatre of operations. Additionally, this equipment will be used during peacetime for training delivery both in the UK and overseas. A PIN has previously been released for this requirement reference 2025/S 000-002913.