| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | DfI Transport and Road Asset Management (TRAM) |
| Main Category: | Works |
| Procurement Method: | Open procedure |
| Tender Status: |
| Open |
| Estimated Value (ex. VAT): | £5,520,000 |
| Estimated Value (inc. VAT): | £6,624,000 |
| Release Date: | 20 November 2026 |
| Application Deadline: | 18 December 2026 |
| Enquiry Deadline: | 18 December 2026 |
| Contract Start Date: | 18 April 2027 (Estimated) |
| Contract End Date: | 18 April 2031 (Estimated) |
| Contract Duration: | 4.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-07c0ce |
| Notice Reference: | 110349-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | With mini-competition (call-off via competition) |
The Department for Infrastructure Inspection and Maintenance of Underground Infrastructure Framework will include the following work activities: A) Desilting of Culverts B) CCTV and Fly-through Surveys of Culverts C) Trenchless / Specialist Repairs of Culverts D) Traffic Management, Gaining Access to Culverts, Associated Civil Works E) Small Scale Civil Works F) Underground Man Entry Repairs The Framework will comprise of three area Lots (Works Orders valued up to £300k) covering the following areas: IMUF 1 - Greater Belfast; IMUF 2 - Coleraine, Omagh and Fermanagh; IMUF 3 - Armagh and Lisburn. Please note: For this procurement, Suppliers submissions are required to be uploaded via the eTendersNI CfT under Lot 1: IMUF 1 (Greater Belfast Area). This will serve as the central submission point for all Lots. Suppliers should submit their responses for every Lot they are tendering for within this single location.
ICC Measured Term Contract for works within the Greater Belfast Area (Works Orders valued up to £300k). The proposed contract relates to works with a cumulative value of £2.6m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £3.25m (ex VAT).
ICC Measured Term Contract for works within the Armagh and Lisburn Areas (Works Orders valued up to £300k). The proposed contract relates to works with a cumulative value of £1.56m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £1.95m (ex VAT).
ICC Measured Term Contract for works within the Coleraine, Omagh and Fermanagh Areas (Works Orders valued up to £300k). The proposed contract relates to works with a cumulative value of £1.5m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £1.5m (ex VAT).
Document pack· 1 file
DfI Rivers Directorate T-1163 Inspection and Maintenance of Underground Infrastructure Framework
DfI Transport and Road Asset Management (TRAM) · WAC-714655
DfI Rivers Directorate T-1163 Inspection and Maintenance of Underground Infrastructure Framework
DfI Transport and Road Asset Management (TRAM) · WAC-714670
DfI Rivers Directorate T-1163 Inspection and Maintenance of Underground Infrastructure Framework
DfI Transport and Road Asset Management (TRAM) · WAC-714672
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
18 December 2026
29 days left
Estimated Value
£5,520,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →