Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Greater Manchester Combined Authority |
| Main Category: | Services |
| Procurement Method: | — |
| Tender Status: |
| Pre-tender |
| Estimated Value (ex. VAT): | £100,000 |
| Estimated Value (inc. VAT): | £120,000 |
| Release Date: | 5 November 2026 |
| Application Deadline: | 13 November 2026 |
| Contract Start Date: | 1 February 2027 (Estimated) |
| Contract End Date: | 1 February 2029 (Estimated) |
| Contract Duration: | 2.0 years |
| Procurement ID (OCID): | ocds-h6vhtk-07b413 |
| Notice Reference: | 105209-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan The Greater Manchester Combined Authority is undertaking an expression of interest for the following: Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP). The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed working in partnership with local authorities and a specialist third-party and will be produced in line with the Town and Country Planning (Local Planning)(England) Regulations 2026 under the new plan-making system. The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027. The proposed commission comprises the following activities: - Strategic Environmental Assessment for Greater Manchester Joint Minerals and Waste Plan - Preparation and consultation on the scope and level of detail of the SEA Environmental Report. This will run at the same time as the consultation on the proposed minerals and waste plan content and evidence. - Preparation and consultation on the proposed SEA Environmental Report. This will run at the same time as the as consultation on the proposed minerals and waste plan. - Review and finalise SEA Environmental Report prior to ‘Gateway 3’.
Published contracts in the last 12 months
425
total contracts
£42805.7m
total value
£369,014,881
average contract size
Typical categories
GMCA 2235 - Spatial Development Strategy
Greater Manchester Combined Authority · WAC-694254
UPS Upgrade and Managed Service
Greater Manchester Combined Authority · WAC-690308
GMCA1996 Innovation Ecosystem Navigation Service
Greater Manchester Combined Authority · WAC-689261
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
13 November 2026
9 days left
Estimated Value
£100,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →