Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | NETWORK RAIL INFRASTRUCTURE LIMITED |
| Main Category: | Goods |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Open |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
16 November 2026
12 days left
Estimated Value
£1,815,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £1,815,000 |
| Estimated Value (inc. VAT): | £2,178,000 |
| Release Date: | 4 November 2026 |
| Application Deadline: | 16 November 2026 |
| Contract Start Date: | 1 March 2027 (Estimated) |
| Contract End Date: | 31 March 2030 (Estimated) |
| Contract Duration: | 3.2 years |
| Procurement ID (OCID): | ocds-h6vhtk-06d6bd |
| Notice Reference: | 104878-2026 |
All 2 notices for this procurement, oldest first.
Provision and Maintenance of Ultrasonic Rail Flaw Detection Devices
Provision and Maintenance of Ultrasonic Rail Flaw Detection Devices
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | Direct call-off (no competition) |
| Maximum operators: | 1 |
Network Rail is carrying out a mini-competition using RISQS code C.C.3.4.5.6: Ultrasonic Testing (Non-Train-Borne) / Service. Network Rail currently operates approximately 30 rail flaw detection devices which are approaching the end of their operational lifespan and require replacement. The objective of this procurement is to identify suppliers capable of supplying new equipment, providing ongoing maintenance and support services, whilst offering competitive whole-life value. It is anticipated that replacement devices will be procured on a phased basis; devices will be called-off from the framework as operational requirements dictate. The appointed supplier will be required to have full product acceptance ahead of the combined Procurement specific Questionnaire (PSQ)/ Invitation to Tender (ITT) closing date. All maintenance will need to be carried out by the Original Equipment Manufacturer (OEM). It is anticipated that the contract will run for three years from April 2027 with a two year option to extend.
Document pack· 1 file
Published contracts in the last 12 months
368
total contracts
£43182.3m
total value
£232,162,915
average contract size
Typical categories