Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender update |
| Buyer: | Swansea University |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Open |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
30 October 2026
8 days left
Estimated Value
£5,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £5,000,000 |
| Estimated Value (inc. VAT): | £6,000,000 |
| Release Date: | 22 October 2026 |
| Application Deadline: | 30 October 2026 |
| Enquiry Deadline: | 27 September 2026 |
| Contract Start Date: | 30 November 2026 (Estimated) |
| Contract End Date: | 30 November 2028 (Estimated) |
| Contract Duration: | 2.0 years |
| Procurement ID (OCID): | ocds-h6vhtk-06b454 |
| Notice Reference: | 099793-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Tender Submission date change
Swansea University is seeking to appoint a suitably qualified contractor to deliver works associated with the Energy Centre upgrade and new District Heat Network (DHN) connection to Union House, forming part of Swansea University’s wider decarbonisation programme at Singleton Campus. The project comprises a significant upgrade to campus heat generation and distribution infrastructure, centred on the installation of approximately 3MW of modular air source heat pump (ASHP) capacity. The project has been developed to RIBA Stage 3 with a fully coordinated design prepared to inform tendering and delivery. The works will be procured via a two-stage tender process, allowing for early contractor engagement during Stage 1 to support design development, buildability, programme optimisation and cost certainty ahead of entering a Stage 2 construction contract.
Document pack· 1 file
Published contracts in the last 12 months
91
total contracts
£62.5m
total value
£2,017,577
average contract size
Typical categories
Tender for FTIR monitoring solution for DRE in semiconductor gaseous abatement systems
Swansea University · WAC-674329
SU172(26) Energy Centre and Union House District Heat Network Connection Works
Swansea University · WAC-660092
SU172(26) Energy Centre and Union House District Heat Network Connection Works
Swansea University · WAC-635749