Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Health and Safety Executive |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | £300,000 |
| Estimated Value (inc. VAT): | £360,000 |
| Release Date: | 7 October 2026 |
| Application Deadline: | 19 October 2026 |
| Contract Start Date: | 24 December 2026 (Estimated) |
| Contract End Date: | 31 March 2027 (Estimated) |
| Contract Duration: | 3 months |
| Procurement ID (OCID): | ocds-h6vhtk-078324 |
| Notice Reference: | 094924-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
HSE have a requirement to create a new gas incident investigation laboratory and evidence store within existing buildings 42 and 45. The buildings require various backlog maintenance works, including replacement of precast concrete lintels, roofing and associated fabric upgrades. Additionally, upgrades are required to the gas main to increase the incoming supply to allow for concurrent testing of appliances. The following services and works are required: • Supply and installation of new Kingspan composite roof panel system • Coordination with Client’s asbestos contractor appointed to remove existing asbestos cement sheet roof • Supply and installation of new roller shutter doors • Replacement of internal doors with new fire rated doors • Replacement of failed concrete lintels and associated masonry repointing • Replacement of final section of existing gas main to increase gas supply • New gas supply to Building 45 • Internal gas works to distribute to testing locations • Internal electrical modifications • Relocation and commissioning of existing equipment including extract booth and heat exchanger • Installation of new epoxy resin flooring throughout • Decorations throughout • The successful contractor shall be required to engage with the HSE’s incumbent ATEX Electrical Contractor SR Electrical Services Ltd. for the installation and commissioning of a new ATEX rated extract fan within the existing extract booth. The works are required at our Buxton site at SK17 9JN. The works are required to commence in January 2027 and to complete by 26th March 2026.
Published contracts in the last 12 months
90
total contracts
£11.6m
total value
£262,592
average contract size
Typical categories
The Provision of a Managed Call Conferencing Service
Health and Safety Executive · WAC-661486
Transmission Electron Microscope (TEM) with Energy Dispersive X-Ray Spectroscopy (EDS) for asbestos analysis
Health and Safety Executive · WAC-658525
The Provision of a Managed Call Conferencing Service
Health and Safety Executive · WAC-653363
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
19 October 2026
13 days left
Estimated Value
£300,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →