| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | The Mayor and Commonalty and Citizens of the City of London |
| Main Category: | Services |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Pre-tender |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£750,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £750,000 |
| Estimated Value (inc. VAT): | £900,000 |
| Release Date: | 29 September 2026 |
| Application Deadline: | — |
| Enquiry Deadline: | 3 November 2026 |
| Contract Start Date: | 16 March 2027 (Estimated) |
| Contract End Date: | 13 July 2029 (Estimated) |
| Contract Duration: | 2.3 years |
| Procurement ID (OCID): | ocds-h6vhtk-077c16 |
| Notice Reference: | 091692-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Temporary Site Services — Barbican Renewal Programme. Site-wide temporary site services for the refurbishment of the existing, occupied Barbican Centre, let under a Construction Management approach with Blue Sky Building appointed as Construction Manager. The Contractor shall design (where required), supply, install, maintain, modify and ultimately remove all temporary site services supporting the site establishment and logistics set-up. Electrical scope comprises temporary distribution systems, boards, cabling, containment and sub-mains, power to all work areas including welding supplies and battery charging stations, and vertical and horizontal distribution to the hoists, tower crane, scaffolding/Haki staircases and the temporary stairs, walkways and loading platforms associated with TP1200. Lighting comprises safe access, emergency escape route, staircase, external, public-route and hoarding/fencing security lighting, with task lighting by others. Mechanical scope comprises temporary potable and non-potable water, chlorination, trace heating and booster pumps where required, supplies to welfare and site facilities, drainage, pumped drainage and waste connections, temporary ventilation, and supplies for commissioning and flushing. Energy metering, testing and commissioning are included throughout. The package also covers phased diversions of existing electrical, water, drainage and RWP services; temporary fire alarm and life-safety measures including interfaces, wireless systems, detectors, call points, evacuation systems and isolations and reinstatements; and temporary security and access arrangements including access control, CCTV, intruder alarms, door release systems and secure partitions. All works are to be phased to suit the site programme within a live, occupied building and may require out-of-hours working. Continuity and protection of landlord/tenant supplies, life-safety systems, critical plant and security systems is to be maintained at all times, with no outages undertaken without approved shutdown procedures. Shutdowns, terminations, isolations and controlled security access — particularly during the Pre-Closure Period — are to be planned and agreed in advance with the Barbican Centre project teams, with applications typically submitted a minimum of 2–4 weeks ahead, supported by shutdown methodologies, outage requests, contingency plans and temporary back-up arrangements. The Contractor shall develop and maintain a phasing strategy covering area-by-area handovers, temporary service adaptations, service migration works and occupier decant phases, and shall allow for all trade contractor access requirements and for fully up-to-date records of all temporary installations. Ongoing obligations include regular inspection, planned and reactive maintenance, fault attendance, PAT and periodic testing, temporary generator support if required, and out-of-hours and 24-hour emergency call-out capability for the full project duration. On completion, temporary installations are to be removed, redundant supplies disconnected and affected areas made good. Utility consumption charges and landlord utility costs are excluded.
Document pack· 1 file
Published contracts in the last 12 months
644
total contracts
£9163.8m
total value
£39,499,339
average contract size
Typical categories
prj_1235 - Health Access Worker service
The Mayor and Commonalty and Citizens of the City of London · WAC-656995
prj_1235 - Health Access Worker service
The Mayor and Commonalty and Citizens of the City of London · WAC-657014
Integrated Facilities Management (IFM) Framework
The Mayor and Commonalty and Citizens of the City of London · WAC-656481