Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Tower Hamlets |
| Main Category: | Works |
| Procurement Method: | Below threshold - open competition |
| Tender Status: | Open |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
6 November 2026
45 days left
Estimated Value
£4,194,210
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £4,194,210 |
| Estimated Value (inc. VAT): | £5,033,052 |
| Release Date: | 22 September 2026 |
| Application Deadline: | 6 November 2026 |
| Enquiry Deadline: | 2 November 2026 |
| Contract Start Date: | 1 February 2027 (Estimated) |
| Contract End Date: | 1 August 2028 (Estimated) |
| Contract Duration: | 1.5 years |
| Procurement ID (OCID): | ocds-h6vhtk-0777ee |
| Notice Reference: | 089825-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Site Location: Former Bradwell Street Garage site, London, E1 4BY, Bethnal Green East ward. The development of this new housing scheme directly supports the Council’s strategic priority to increase the supply of affordable homes within the borough and address the growing challenges of homelessness and overcrowding. It aligns with the Council’s new 10-year Housing Strategy, More Homes. Better Homes. Safer Homes, which outlines the ambition to deliver high-quality homes for local residents. With over 30,000 households currently on the Council’s housing register, many families face significant difficulties in securing homes that are safe, secure, and suitable for their needs. The Bradwell Street development will deliver seven intentionally designed large family homes, all comprising four bedrooms. This includes one 4-bedroom, 8-person M4(3) wheelchair-accessible home, specifically designed to meet the needs of residents identified through Project 120—Tower Hamlets’ initiative supporting the borough’s most acutely disabled families. This purpose-built scheme places residents at the centre of the design process, ensuring that the needs of end users are fully considered and incorporated. The development has been designed in accordance with non-accredited Passivhaus principles, promoting enhanced energy efficiency and sustainability. The site is located adjacent to Network Rail on a constrained infill plot. The proposed construction programme reflects the challenges associated with Build Adjacent to Public Assets (BAPA) risks, with an estimated duration of approximately 18 months from groundbreaking to practical completion. The main works contract is expected to remain in place for a further 12 months post–practical completion to cover the defects liability period.
Document pack· 1 file
Published contracts in the last 12 months
125
total contracts
£2848.9m
total value
£39,568,457
average contract size
Typical categories