| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Mining Remediation Authority |
| Main Category: | Works |
| Procurement Method: | — |
| Tender Status: | Pre-tender |
| Estimated Value (ex. VAT): | Not specified |
| Release Date: | 21 September 2026 |
| Application Deadline: | 9 October 2026 |
| Contract Start Date: | 1 June 2027 (Estimated) |
| Contract End Date: | 31 August 2028 (Estimated) |
| Contract Duration: | 1.3 years |
| Procurement ID (OCID): | ocds-h6vhtk-077692 |
| Notice Reference: | 089214-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
🤝 Need a consortium or subcontracting partner?
SMEs & Primes team up to win opportunities like this. Find partners on the board.
These works will be delivered as part of the Wales Metal Mine Programme (WMMP) between NRW and the Mining Remediation Authority. This programme supports the Western Wales River Basin Management Plan (Western Wales River Basin Management Plan 2021 – 2027 which was published as a final plan in July 2022 (specifically measures CYM49 - Deliver metal (non-coal) mine water programme as identified under the Metal Mine Strategy for Wales and WW0031 - Continue to investigate mine water impact and develop remediation plans in accordance with the Metal Mines Strategy for Wales). This plan has a statutory function associated with the Water Framework Directive (The Water Environment (Water Framework Directive) (England and Wales) Regulations 2017). Works – Summer 2027 • Introduction of an Upper Storage/Attenuation Pond to reduce flows into Upper Mill Race Stream. This will include increasing the existing bund height and installing flow control infrastructure. Approx length 90 metres and approx. height 1.5 metres. • Bypass the circular collapse feature east of Glanville’s Shaft with new open channel. • Introduction of highway drainage system and filter drain to avoid runoff finding its way into the main spoil tip. • A new lined water channel with flow monitors from the public highway to the Nant Cwmnewydion, construing a new ford crossing and improving the existing ford crossing. Approx. length 95 metres.
Published contracts in the last 12 months
91
total contracts
£14.9m
total value
£1,859,375
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
9 October 2026
18 days left
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →