Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | ORBIT GROUP LIMITED |
| Main Category: | Goods |
| Procurement Method: | Open procedure |
| Tender Status: | Open |
| Estimated Value (ex. VAT): | £85,700,000 |
| Estimated Value (inc. VAT): | £85,700,000 |
| Release Date: | 18 September 2026 |
| Application Deadline: | 19 October 2026 |
| Enquiry Deadline: | 12 October 2026 |
| Procurement ID (OCID): | ocds-h6vhtk-0697f0 |
| Notice Reference: | 088503-2026 |
All 2 notices for this procurement, oldest first.
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | Both: direct call-off and mini-competition |
| Maximum operators: | 240 |
This Procurement is designed to establish a Closed Framework through an Open Procedure in line with PA23 for the supply, design, manufacture, delivery and/ or hire of building materials, associated products, equipment and construction fuel for Orbit Group Limited and any other Authority Group member entitled to use the Framework Agreement. It is intended to provide a resilient, compliant and value-for-money supply route that supports Orbit Homes (2020) Limited and the wider Orbit Group in delivering safe, affordable, high-quality and sustainable homes. The Framework will consist of 28 individual Lots for the supply of key materials used in the construction and regeneration of our homes. The estimated Framework value across all Lots over the 4 year term is £85.7m The Framework will comprise of the following Lots, with potential suppliers invited to tender for any them: Lot 1 - Midlands - Facing Bricks, Brick Arches and Brick Specials Lot 2 - Midlands - Thermal and Concrete Blocks Lot 3 - Midlands - Joists and Trusses Lot 4 - Midlands - Thermally Broken Lintels and Steel Lot 5 - Midlands - Soffit, Fascia, GRP and Cladding - design, manufacture, supply and delivery Lot 6 - Midlands - Stone Cils manufacture, supply and delivery Lot 7 - Midlands - Internal Doors and Linings Lot 8 - Midlands - First and Second Fix Timbers Lot 9 - Midlands - Ironmongery Lot 10 - Midlands - Staircases Lot 11 - Midlands - Garage Doors Lot 12 - Midlands - Small Plant Hire Lot 13 - Midlands - Forklift and Telehandler Hire Lot 14 - Midlands - Fuel, Construction use only Lot 15 - East - Facing Bricks, Brick Arches and Brick Specials Lot 16 - East - Thermal and Concrete Blocks Lot 17 - East - Joists and Trusses Lot 18 - East - Thermally Broken Lintels and Steel Lot 19 - East - Soffit, Fascia, GRP and Cladding - design, manufacture, supply and delivery Lot 20 - East - Stone Cils manufacture, supply and delivery Lot 21 - East - Internal Doors and Linings Lot 22 - East - First and Second Fix Timbers Lot 23 - East - Ironmongery Lot 24 - East - Staircases Lot 25 - East - Garage Doors Lot 26 - East - Small Plant Hire Lot 27 - East - Forklift and Telehandler Hire Lot 28 - East - Fuel, Construction use only The estimated lot values are detailed within the ITT. Please ensure you login on to Pro-contract to access the tender documents.
Supply facing bricks, brick arches and brick specials in accordance with planning requirements, technical specifications, product schedules and site programmes.
Contract period: — → 24 January 2031
Supply thermal and concrete blocks in accordance with drawings, U value requirements, technical specifications and product schedules.
Contract period: — → 24 January 2031
Design, manufacture, supply and delivery of all timber joists, engineered joists and roof trusses as per house type. Submissions must address design basis, drawings, calculations where required, inclusion checklist, bracing, wall plates, metalwork, restraint straps, protection kits, stairwell protection where applicable, offload restrictions, delivery assumptions and approval process.
Contract period: — → 24 January 2031
Supply thermally broken lintels, steel products and associated items.
Contract period: — → 24 January 2031
Supply soffit, fascia, GRP and cladding products. Commodity elements may be priced using product schedules. GRP, cladding and plotted or design-led items must be priced using drawings, elevations, plot schedules, fixing assumptions, colour and finish requirements, certification requirements and inclusion checklists.
Contract period: — → 24 January 2031
Manufacture, supply and deliver stone cills in accordance with drawings, profiles, sizes, finishes and technical specification.
Contract period: — → 24 January 2031
Supply internal doors and linings in accordance with tenure specifications, house type schedules, drawings and project requirements.
Contract period: — → 24 January 2031
Supply first and second fix timbers, associated sheet materials and finishing materials where specified.
Contract period: — → 24 January 2031
Supply ironmongery in accordance with specifications, door schedules and tenure requirements. Schedules must capture social rent handles, house number plaques and loft access doors or loft traps where included.
Contract period: — → 24 January 2031
Design, manufacture, supply and delivery of all staircases in accordance with drawings, specifications, house type information and approved design submissions.
Contract period: — → 24 January 2031
Supply garage doors in accordance with project schedules, drawings and specifications.
Contract period: — → 24 January 2031
Provide small plant hire in accordance with the equipment list, site requirements and hire schedule. Pricing must include weekly hire rates, pro rata treatment for additional days, delivery, collection, maintenance, replacement, breakdown support, safety documentation and low emission or electric alternatives where available.
Contract period: — → 24 January 2031
Provide hire in accordance with the equipment list, site requirements and hire schedule. Pricing must include weekly hire rates, pro rata treatment for additional days, delivery, collection, maintenance, replacement, breakdown support, safety documentation and low emission or electric alternatives where available.
Contract period: — → 24 January 2031
Provide fuel for construction use only as per technical specification.
Contract period: — → 24 January 2031
Supply facing bricks, brick arches and brick specials in accordance with planning requirements, technical specifications, product schedules and site programmes in the East.
Contract period: — → 24 January 2031
Supply thermal and concrete blocks in accordance with drawings, U value requirements, technical specifications and product schedules in the East.
Contract period: — → 24 January 2031
Design, manufacture, supply and delivery of all timber joists, engineered joists and roof trusses as per house type in the East.
Contract period: — → 24 January 2031
Supply thermally broken lintels, steel products and associated items in the East.
Contract period: — → 24 January 2031
Supply soffit, fascia, GRP and cladding products in the East. Commodity elements may be priced using product schedules. GRP, cladding and plotted or design-led items must be priced using drawings, elevations, plot schedules, fixing assumptions, colour and finish requirements, certification requirements and inclusion checklists.
Contract period: — → 24 January 2031
Manufacture, supply and deliver stone cills in accordance with drawings, profiles, sizes, finishes and technical specification in the East.
Contract period: — → 24 January 2031
Supply internal doors and linings in accordance with tenure specifications, house type schedules, drawings and project requirements in the East.
Contract period: — → 24 January 2031
Supply first and second fix timbers, associated sheet materials and finishing materials where specified in the East.
Contract period: — → 24 January 2031
Supply ironmongery in accordance with specifications, door schedules and tenure requirements in the East.
Contract period: — → 24 January 2031
Design, manufacture, supply and delivery of all staircases in accordance with drawings, specifications, house type information and approved design submissions in the East.
Contract period: — → 24 January 2031
Supply garage doors in accordance with project schedules, drawings and specifications in the East.
Contract period: — → 24 January 2031
Provide small plant hire in accordance with the equipment list, site requirements and hire schedule. Pricing must include weekly hire rates, pro rata treatment for additional days, delivery, collection, maintenance, replacement, breakdown support, safety documentation and low emission or electric alternatives where available in the East.
Contract period: — → 24 January 2031
Provide hire in accordance with the equipment list, site requirements and hire schedule. Pricing must include weekly hire rates, pro rata treatment for additional days, delivery, collection, maintenance, replacement, breakdown support, safety documentation and low emission or electric alternatives where available in the East.
Contract period: — → 24 January 2031
Provide fuel for construction use only as per technical specification in the East.
Contract period: — → 24 January 2031
Document pack· 1 file
Published contracts in the last 12 months
140
total contracts
£2513.3m
total value
£89,759,771
average contract size
Typical categories
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
19 October 2026
31 days left
Estimated Value
£85,700,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →