| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | Kings Lynn Internal Drainage Board |
| Main Category: | Goods |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Pre-tender |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
20 October 2026
31 days left
Estimated Value
£390,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): | £390,000 |
| Estimated Value (inc. VAT): | £468,000 |
| Release Date: | 18 September 2026 |
| Application Deadline: | 20 October 2026 |
| Enquiry Deadline: | 12 October 2026 |
| Contract Start Date: | 6 November 2026 (Estimated) |
| Contract End Date: | 1 September 2027 (Estimated) |
| Contract Duration: | 10 months |
| Procurement ID (OCID): | ocds-h6vhtk-077549 |
| Notice Reference: | 088613-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
This procurement covers the design, manufacture, fabrication, providing, supplying and delivery of two pumps and pre-cast concrete units (PCCU) that form the pump sump, support and inlet structure for the new pumping station for the North Wootton pumping station replacement project. The value is estimated at circa £390,000 total. These figures are exclusive of VAT. The pumps will have high efficiency, low maintenance requirements and will deliver a broad range of flow rates at their design heads. The pumps will provide safe passage for eels and fish and deliver a Best Achievable Eel Protection (BAEP) solution that reduces the killing and injury of fish, improving downstream passage. The requirement is: The design, manufacture, fabrication, providing, supplying and delivery of pumps for North Wootton pumping station. This includes Design, Testing and providing the required information for the Health and Safety File and Operations and Maintenance Manual. The Water Management Alliance (WMA) will oversee this procurement on behalf of the King’s Lynn Internal Drainage Board working with Turner & Townsend as advisors.