Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Tender notice |
| Buyer: | Livv Housing Group |
| Main Category: | Services |
| Procurement Method: | Open procedure |
| Tender Status: | Open |
| Estimated Value (ex. VAT): | Not specified |
| Estimated Value (inc. VAT): | £41,640,000 |
| Release Date: | 14 September 2026 |
| Application Deadline: | 27 October 2026 |
| Contract Start Date: | 7 December 2026 (Estimated) |
| Contract End Date: | 6 December 2030 (Estimated) |
| Contract Duration: | 4.1 years |
| Procurement ID (OCID): | ocds-h6vhtk-06c3a3 |
| Notice Reference: | 087085-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
| Call-off method: | Both: direct call-off and mini-competition |
Livv Housing Group has a stock of approximately 13,000 homes and whilst their main area of operation is currently Knowsley, services may also be required within the wider Liverpool City Region. In addition to this, the Group also has some outlying stock in the broader North West area. The Livv Maintenance team currently consists of approximately 120 operatives providing a range of services including responsive repairs and maintenance services, cyclical works, planned investment and voids work to ensure the Group's housing stock remains in an excellent condition. The Group is seeking bids for a framework of contractors to support Livv Maintenance in conducting responsive repairs, maintenance work and void property works across multiple lots. The framework is divided into two workstreams: 1. REPAIRS: covering responsive repairs and maintenance to occupied properties. Lots 1 to 16 2. VOIDS: covering works to empty properties ahead of re-letting. Lots 17 to 32 Each Voids lot mirrors the trade scope of its corresponding Repairs lot but is tendered and awarded separately. Bidders can bid on one or more lots. The full-service specification is included within the Supporting Information section of this tender.
Included but not limited to: internal doors, door frames, skirting boards, architrave, staircases, kitchen units and worktops, shelving, and general timber repairs
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: general fabric repairs, minor structural repairs, render and external wall repairs, minor masonry, glazing and window pane replacement, and multi-trade responsive repairs not covered by a specialist lot.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: boiler servicing, repair and replacement, gas fire servicing and repair, landlord gas safety checks (CP12), and central heating system repairs.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: leaks and burst pipes, WC, basin, bath and shower repair and replacement, tap replacement, water tank and cylinder repairs, and waste pipe repairs
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: electrical fault finding and repair, socket and switch replacement, consumer unit repairs and upgrades, lighting repairs.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: installation, maintenance and repair of solar PV panels, inverters, and battery storage systems, and associated electrical safety testing.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: repair of air source heat pump units, associated controls and thermostats, and integration with existing heating systems.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: treatment of rodent, insect infestations, pigeon proofing.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: blocked drain clearance, drain repairs, gulley and drainage clearance, and soil pipe repairs.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: servicing, repair and installation of solid fuel stoves and open fires, and chimney and flue inspection and repair.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: damp proof course installation and repair, damp and mould treatment, plastering, re-plastering, and rendering.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: repointing, brick and blockwork repairs, chimney stack repairs, and minor structural brickwork.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: UPVC and composite window unit repair and replacement, external door unit repair and replacement, glazing units, and locks and hinges.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: paving and pathway repairs, boundary fencing and gate installation, and grounds maintenance requiring machinery.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: internal and external painting, wallpapering, and minor preparation works (filling, sanding).
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: carpets, vinyl flooring, laminate flooring, and floor tiling.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: internal doors, door frames, skirting boards, architrave, staircases, kitchen units and worktops, shelving, and general timber repairs
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: general fabric repairs, minor structural repairs, render and external wall repairs, minor masonry, glazing and window pane replacement, and multi-trade responsive repairs not covered by a specialist lot. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: boiler servicing, repair and replacement, gas fire servicing and repair, landlord gas safety checks (CP12), and central heating system repairs. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: leaks and burst pipes, WC, basin, bath and shower repair and replacement, tap replacement, water tank and cylinder repairs, and waste pipe repairs. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: electrical fault finding and repair, socket and switch replacement, consumer unit repairs and upgrades, lighting repairs. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: installation, maintenance and repair of solar PV panels, inverters, and battery storage systems, and associated electrical safety testing. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: repair of air source heat pump units, associated controls and thermostats, and integration with existing heating systems. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: treatment of rodent, insect infestations, pigeon proofing. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: blocked drain clearance, drain repairs, gulley and drainage clearance, and soil pipe repairs. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: servicing, repair and installation of solid fuel stoves and open fires, and chimney and flue inspection and repair. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: damp proof course installation and repair, damp and mould treatment, plastering, re-plastering, and rendering. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: repointing, brick and blockwork repairs, chimney stack repairs, and minor structural brickwork. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: UPVC and composite window unit repair and replacement, external door unit repair and replacement, glazing units, and locks and hinges. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: paving and pathway repairs, boundary fencing and gate installation, and grounds maintenance requiring machinery. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: internal and external painting, wallpapering, and minor preparation works (filling, sanding). This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Including, but not limited to: carpets, vinyl flooring, laminate flooring, and floor tiling. This lot is specifically for works taking place in empty properties.
Contract period: 7 December 2026 → 6 December 2030
Document pack· 2 files
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Application Deadline
27 October 2026
Closed
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →