Loading page content…
Loading page content…
Loading contract search results…
Loading contract details…
| Source: | Find a Tender Service (FTS) |
| Notice Type: | Pipeline / planning |
| Buyer: | The Mayor and Commonalty and Citizens of the City of London |
| Main Category: | Works |
| Procurement Method: | Competitive flexible procedure |
| Tender Status: | Pre-tender |
Pipeline status
Not addedImports the contract into your BidWriter pipeline · Qualify before you commit to bid
Estimated Value
£16,000,000
Need help writing this bid?
Our specialists write winning tender responses. Free consultation, no obligation.
Book a free consultation →| Estimated Value (ex. VAT): |
| £16,000,000 |
| Estimated Value (inc. VAT): | £19,200,000 |
| Release Date: | 2 September 2026 |
| Application Deadline: | — |
| Enquiry Deadline: | 9 October 2026 |
| Contract Start Date: | 28 March 2027 (Estimated) |
| Contract End Date: | 18 December 2028 (Estimated) |
| Contract Duration: | 1.8 years |
| Procurement ID (OCID): | ocds-h6vhtk-06f01b |
| Notice Reference: | 082925-2026 |
Ready to bid on this contract?
BidWriter AI writes your tender response in minutes — import this contract in one click.
View Original Notice
Access the full notice on the official portal
Refurbishment and alteration to an existing, occupied Grade II listed Brutalist concrete building (1965–1982) — not new-build; minimal structural intervention philosophy, using existing capacity and justifying retained elements without strengthening wherever possible. The project comprises demolition, enabling, temporary works and primary structural design and construction across the Renewal Phase 1 work areas, together with a sitewide Contractor Design Portion (CDP) framework covering secondary/tertiary steelwork, non-loadbearing masonry, builders work openings, steel reuse and other structure-adjacent design responsibilities. This package also carries a defined allocation of architectural fabric-removal (“Advanced Works”) scope and a smaller number of new internal partition and screed items prepared by the Architect, allocated to this package because they precede, depend upon, or are structurally coincident with the demolition and structural strip-out sequence. • Infrastructure and Sitewide Structural Works. • Conservatory: Level 3 demolition/strengthening. • Foyers: Foyers Bridge steelwork dismantling/re-decking, Foyer Shop demolition, shaft-opening coordination. • Catering Block: Shaft 08–11 slab modifications across multiple levels • Stair 8: structural coordination
Document pack· 1 file
Published contracts in the last 12 months
650
total contracts
£8555.2m
total value
£38,023,165
average contract size
Typical categories
Real Estate Valuation & Development Software Solution
The Mayor and Commonalty and Citizens of the City of London · WAC-650064
City of London - HRA - Maintenance of Lifts and Platform Lifts
The Mayor and Commonalty and Citizens of the City of London · WAC-646656
Report Fraud ITSM Replacement
The Mayor and Commonalty and Citizens of the City of London · WAC-646025